A complete construction process guide from site excavation to building handover – ideal for homeowners, civil engineers, and builders.
1. Site Preparation and Layout
Clear vegetation, debris, and unwanted structures.
Perform site survey and set layout lines.
Mark excavation areas as per approved drawings.
2. Excavation Work
Excavate trenches for foundation as per structural design.
Provide shoring or safety supports if trenches are deep.
Remove loose soil and maintain slope stability.
3. PCC (Plain Cement Concrete)
Lay PCC at the bottom of the foundation trench.
Mix ratio: 1:4:8 (cement:sand:aggregate)
Provides a firm, level base for footing concrete.
4. Foundation Construction
Place reinforcement as per design.
Use shuttering and pour footing concrete (M20 or higher grade).
Ensure proper compaction and curing.
5. Plinth Beam and Backfilling
Cast plinth beam over the foundation.
Apply anti-termite treatment.
Backfill around foundation and compact in layers.
6. Superstructure: Column, Beam, and Slab
Raise RCC columns from plinth level.
Construct beams and slab framework.
Reinforce and pour concrete for each stage.
7. Brickwork or Blockwork
Start masonry after column/slab curing.
Use 1:6 cement mortar for bricks.
Leave provisions for doors, windows, and conduits.
8. Lintel and Sunshade (Chajja)
Cast lintels above door and window openings.
Provide RCC chajjas for sunshade and water protection.
9. Roof Waterproofing
Apply waterproofing treatment on slab top.
Options: Bitumen coating, liquid membrane, or chemical layers.
10. Electrical and Plumbing (1st Fix)
Lay concealed electrical conduit and switch boxes.
Install water supply and drainage pipes in walls and floors.
Ensure proper slope and leak testing.
11. Internal & External Plastering
Internal walls plastered with 12–15mm cement plaster.
External walls with waterproof additive for durability.
Corners and joints should be well finished.
12. Flooring and Tiling Work
Lay floor tiles, wall tiles in toilets/kitchens.
Marble/granite as per selection.
Use spacers and apply proper grouting.
13. Doors and Windows
Fix door and window frames first.
Install shutters (wooden, UPVC, or aluminum).
Check alignment, level, and sealing.
14. Painting & Finishing
Apply wall putty and primer.
Paint interior and exterior walls.
Use weather-resistant paint for exteriors.
15. Sanitary & Electrical Fixtures
Fit basins, commodes, taps, mixers.
Fix switches, MCBs, fans, and lights.
Install geysers, exhaust fans, and other appliances.
16. Final Cleaning and Touchups
Deep clean all surfaces.
Grout tiles, polish doors, and fittings.
Prepare site for handover.
This step-by-step process ensures systematic, safe, and efficient building construction. Whether you're a builder or a homeowner, understanding this flow helps you plan, budget, and monitor work properly.