Welcome to our Tickets and Subscriptions page — your one-stop destination for everything you need to travel seamlessly with us.
Whether you're a daily commuter, an occasional traveler, or visiting the area for the first time, we offer a range of flexible and affordable options to suit your needs.
The line A is going to close from Monday 5th May 2025 to summer 2026 due to infrastructure renovation works.
Read the article about the campaign started by ATA to stop this dangerous practice. Choose life, stay inside.
The signage renewal campaign has begun in the city’s subway stations over the past few days. The project, which will affect all major lines and stops, aims to make information clearer, more visible, and more accessible to all passengers, including tourists and people with disabilities.
The updated signage will feature a modern design, international pictograms, and multilingual instructions, as well as improved placement of information panels. Work will be carried out during nighttime hours to minimize inconvenience for commuters.
The entire operation is scheduled to be completed by the end of September, ensuring a more efficient and welcoming network starting this fall.
Read more here.
Read about nighttime metro here.
LINE 1
length: 23,5 km
stations: 17
medium distance between stations: 1,4 km (15 mins. walking)
connecting lines: 2, 3, 4, A, C, S, National Railway
inauguration: 01/01/1969
last extension: 08/10/2023
average daily ridership 420.000
average awaiting time 3'
trains per hour 20
LINE 2
length: 26,4 km
stations: 15 (+1 under construction opening in 2026)
medium distance between stations: 1,7 km (20 mins. walking)
connecting lines: 1, 3, 4, A, National Railway
inauguration: 07/07/1975
last extension: 18/05/1999
average daily ridership: 310.000
average awaiting time 4'
trains per hour 15
LINE 3
length: 34,8 km
stations: 21 (+1 under construction opening in 2026)
medium distance between stations: 1,6 km (18 mins. walking)
connecting lines: 1, 2, National Railway
inauguration: 27/09/1991
last extension: 30/10/2015
average daily ridership: 260.000
average awaiting time 5'
trains per hour 12
LINE 4
length: 19,5 km
stations: 15
medium distance between stations: 1,3 km (15 mins. walking)
connecting lines: 1, 2, A
inauguration: 16/12/2005
last extension: 15/02/2011
average daily ridership: 220.000
average awaiting time 7'
trains per hour 9
LINE A
length: 20,7 km
stations: 11 (+6 under construction opening in 2028)
medium distance between stations: 1,8 km (21 mins. walking)
connecting lines: 1, 2, 4, B, S, National Railway
inauguration: 16/08/1925
last extension: 1994
average daily ridership: 200.000
average awaiting time 10'
trains per hour 6
LINE B
length: 44,4 km
stations: 24
medium distance between stations: 1,8 km (21 mins. walking)
connecting lines: A, C
inauguration: 01/03/1894
last extension: 12/10/2003
average daily ridership: 250.000
average awaiting time 11'
trains per hour 5
LINE C
length: 6,9 km
stations: 4
medium distance between stations: 1,7 km (20 mins. walking)
connecting lines: 1, B
inauguration: 04/05/1993
average daily ridership: 34.000
average awaiting time 5'
trains per hour 12
TOTAL (lines A, B, C included)
length: 176,5 km
stations: 107
medium distance between stations: 1,6 km
lines: 7
average daily ridership: 242.000
total daily ridership: 1.694.000
annual ridership: 618.310.000 (extremely variable data)
average awaiting time on normal metro 4'
average awaiting time on railways 8'
average awaiting time 6'
Miazo
Archema 176,5 km
Port Tragiva 82,1 km
Biscay 82 km
Ashford 57,7 km
Brixen 15,4 km
Europe
Moscow 461,4 km
London 402 km
Madrid 293,9 km
Paris 245,6 km
Archema 176,5 km
Barcelona 157,8 km
Berlin 155,4 km
Saint Petersburg 124,8 km
Milan 111,8 km
Stockholm 108 km
Hamburg 106 km
Rotterdam 102,3 km
Munich 95 km
Athens 91,7 km
Oslo 85 km
Vienna 83,3 km
Port Tragiva 82,1 km
Biscay 82 km
Bucharest 79 km
Newcastle upon Tyne 77,5 km
Kyiv 69,6 km
Prague 65,4 km
Rome 59,4 km
Ashford 57,7 km
Sofia 52 km
Bilbao 45,1 km
Lille 45 km
Lisbon 44,2 km
Helsinki 43 km
Amsterdam 41,2 km
Warsaw 41,2 km
Minsk 40,8 km
Baku 40,3
Bruxelles 39,9 km
Budapest 39,4 km
Nuremberg 38,4 km
Copenhagen 38,2 km
Charkiv 38,1 km
Naples 36,4 km
Lyon 34,4 km
London DLR 34 km
Tbilisi 27,3 km
Tolouse 27,1 km
Marseille 22,7 km
Rennes 22,4 km
Niznij Novgorod 21,4 km
Kazan' 16,7 km
Brixen 15,7 km
Turin 15,1 km
Brescia 13,7
Yerevan 12,1 km
Samara 11,6 km
Glasgow 10,5 km
Catania 8,7 km
Genoa 7,1 km
Dnipro 7,1 km
Losanne 5,9 km
Thessaloniki 9,6 km
RIVER TRAM - line 1
length: 7,5 km
stations: 8
medium distance between stations: 940 m.
connecting lines: 1, 2
inauguration: 08-09-1906
last extension: 01-03-2008
average daily ridership 56.000
average awaiting time 7'
trams per hour 9
PARK TRAM - line 2
length 4,7 km
stations: 5
medium distance between stations 940 m.
connecting lines 1
inauguration 16-10-1921
last extension 09-11-1994
average daily ridership 31.000
average awaiting time 6'
trams per hour 10
MONUMENTAL TRAM - line 3
length 2,7 km
stations 5
medium distance between stations 540 m.
connecting lines //
inauguration 27-06-1886
last extension 12-02-2013
average daily ridership 39.000
average awaiting time 7'
trams per hour 5
OPERA TRAM - line 4
length 3,8 km
stations 6
medium distance between stations 630 m.
connecting lines 1
inauguration 02-01-1982
last extension 12-12-2004
average daily ridership 37.000
average awaiting time 7'
trams per hour 5
TOTAL
length 18,7 km
stations 24
medium distance between stations 780 m.
lines 4
average daily ridership 163.000
annual ridership 59.495.000
average awaiting time 7'
LINE 1
length 18 km
stations 21 (860 m. medium d. between 2 stations)
LINE 2
length 9 km
stations 12 (750 m. "")
LINE 3
length 7 km
stations 10 (700 m. "")
LINE 4
same as today
LINE 5 (2021-A.T.)
length 8,2 km
stations 15 (550 m. "")
LINE 6 (Crystal-Europe Airport)
length 15 km
stations 19 (790 m. "")
Sadly yes, this site has automatic translator, so the station names will be different in every language, we apologize.