Here’s an overview of the main steps involved in building your custom pool:
1. Initial Consultation & Design
Timeframe: 1-2 weeks We start with an in-depth consultation to understand your needs, preferences, and budget. Our design team will then create a custom pool design based on your input. During this phase, we also review important factors such as pool location, size, materials, and any additional features like lighting, waterfalls, or landscaping.
2. Permits and Approvals
Timeframe: 2-4 weeks Once the design is finalized, we handle all necessary permits and approvals required by local regulations. This step is critical to ensure the pool is compliant with building codes and safety standards. While the timeframe for permits can vary depending on your location, our team works diligently to expedite this process.
3. Excavation
Timeframe: 1 week With permits in hand, we begin excavation—digging out the space where your pool will be installed. This step involves carefully marking the area, removing dirt, and shaping the land to match your custom pool design. We ensure the ground is properly prepared to support the structure.
4. Structural Framework & Plumbing
Timeframe: 1-2 weeks Next, we install the rebar and framework that will form the foundation of your pool. At this stage, plumbing lines are also laid out for proper water circulation and drainage. This is one of the most important structural phases, as it ensures your pool is safe and durable.
5. Pool Shell Installation
Timeframe: 1-2 weeks Once the framework is complete, we install the pool’s shell. Whether you’ve chosen a concrete (gunite), fiberglass, or vinyl liner pool, this phase involves pouring or placing the shell material and allowing it to set properly. For concrete pools, gunite is sprayed onto the framework, followed by curing time to strengthen the structure.
6. Electrical & Equipment Installation
Timeframe: 1 week At this stage, all electrical components like lighting, pumps, heaters, and other equipment are installed. These systems are crucial for keeping your pool functional, energy-efficient, and aesthetically pleasing.
7. Tile & Coping Installation
Timeframe: 1 week To add those finishing touches, we install the pool’s tiles and coping (the material surrounding the pool edge). You can choose from a variety of tile designs and coping materials to match your desired aesthetic.
8. Pool Decking & Surrounding Landscaping
Timeframe: 1-2 weeks The pool deck and surrounding landscaping are then added to complement your pool. We offer various decking options such as pavers, concrete, or natural stone. Landscaping, lighting, and additional features are also completed during this phase to create a cohesive backyard oasis.
9. Filling and Balancing the Water
Timeframe: 2-3 days Finally, your pool is filled with water, and we balance the chemicals to ensure the water is safe and ready for use. At this stage, we also conduct a final inspection to ensure everything is functioning correctly.
10. Final Walkthrough & Handover
Timeframe: 1 day Once the pool is complete, we’ll do a final walkthrough with you to review all features, equipment, and maintenance instructions. This ensures you’re fully comfortable with using and caring for your new pool.
The total time from initial consultation to a completed pool can vary depending on factors such as design complexity, weather, and permitting. However, on average, our custom pool construction process takes about 8 to 12 weeks. Rest assured, we’ll keep you updated at every stage to ensure a seamless experience.
At Alpine Pools & Backyard Living, we’re dedicated to delivering top-quality pools that exceed expectations. Our detailed planning and construction process ensures that you receive a pool that not only looks amazing but is built to last for years of enjoyment. Contact us today to schedule a free consultation and begin the journey to your dream backyard!