KAVACH system
कवच प्रणाली
Welcome to S&T Online Portal for AGC Division of NCR.
कवच प्रणाली
Specifications and all annexures pertaining to KAVACH. ALL ANNEXURES ISSUED IN JUNE-2024/ JULY-2024
2025-01-28-Final FAT Testing Procedure Ver 1_2 Dated 27-01-2025
Functional Requirements Specification of KAVACH RDSO-SPN-196-2020 version 4-0 APR-22
System requirements Specification Amdt. 3, Ver 4_0 07.06.2024
Annexure-A1- Mode Transition, SOS and MA handling Amdt-6 16-07-2024 Final Signed
Annexure-B-LP-OCIP Display Requirement - Amdt-3 Final Signed
ANNEXURE-E1 SPECIFICATION OF KAVACH (THE INDIAN RAILWAY ATP)-UHF RADIO MODEM REQUIREMENTS signed
Annexure F- Specification of Kavach-RFID Tag and Fixing Arrangement Guidelines Amdt-1
Annexure – J -Specification of KAVACH (The Indian Railway ATP)- Remote Interface Unit Amdt-3 Signed
Pre-commissioning Checklists for HBL Make KAVACH
Pre-commissioning Checklists for MEDHA Make KAVACH
Various schemes, JPO, technical letters pertaining to KAVACH
Advance execution of infra works like towers etc for KAVACH 11.09.2023
Components of KAVACH or CTC inclusion in yard remodelling-ABC etc works 18.05.2023
Implementation of Kavach System on Indian Railways in Mission Mode 09.08.2024
Implementation of Measures Related to Kavach System 11.04.25
IRISET Letter for Kavach on IGOT Karmayogi Bharat portal 11.03.2025
Signalling Alteration or Modification works in existing or proposed Kavach territory 29.05.2024
Streamlining of Maintenance activity for KAVACH assets 17.01.25