Context
The images below show the construction of the base of the final model. This assembly includes all plywood parts of the final model, as well as the acrylic windows in the walls of the upstream area so drainage will be visible in the final design. Next steps for the assembly will be to assemble the basins out of acrylic, caulk all intersection points in the plywood assembly, and apply waterproofer to the plywood assembly. The dam at the end of the downstream area will be 3D printed instead of made from plywood to fit exact dimensions of the structure. The area where the dam will go can be seen from the front view image below.
Image of Top View of Base Assembly.
Image of Front View of Base Assembly.
Image of Side View of Base Assembly.
Image of Back View of Base Assembly.
The image carousel below shows images from the construction process from this deliverable.
Images of Base of Table Construction Process.