Architectural plans
Structural plans
Electrical plans
Plumbing plans
Mechanical plans
Bill of Materials
House Construction
Building Construction
Interior Works
Condominium Unit Fit-outs
Commercial Unit Fit-outs
Office Layout
Repair and Renovation
FLOOR : POLISHED CONCRETE
WALL : PLASTERED WALL
DOORS & WINDOWS : NOT INCLUDED
CEILING : EXPOSED CEILING
KITCHEN : PLUMBING PROVISION
TOILET & BATH : PLUMBING PROVISION
FENCE & GATE : NOT INCLUDED
FLOOR : VINYL TO TILES
WALL : PLAIN PAINTED W/ ACCENT
DOORS & WINDOWS : FLUSH DOOR, STANDARD TO BIGGER WINDOW
CEILING : GYPSUM / FICEM BOARD
KITCHEN : CONCRETE COUNTER W/ SINK
TOILET & BATH : PLUMBING PROVISION
FENCE & GATE : NOT INCLUDED
FLOOR : TILES TO NATURAL STONES
WALL : ACCENT & TEXTURED WALLS
DOORS & WINDOWS : SOLID DOOR , BIGGER TO FULL WINDOW
CEILING : PVC PANELS
KITCHEN : CERAMIC COUNTERTOP
TOILET & BATH : ORDINARY FIXTURES
FENCE & GATE : NOT INCLUDED
FLOOR : PROCELAIN TO NATURAL STONE
WALL : ACCENT & TEXTURED WALLS
CEILING : COVE CEILING, WOOD PANELS
DOORS & WINDOWS : LARGE SOLID DOOR , FULL TO DOUBLE GLAZED
KITCHEN : GRANITE COUNTERTOP
TOILET & BATH : BRANDED FIXTURES
FENCE & GATE : NOT INCLUDED
I M P O R T A N T : P L E A S E B E G U I D E D
Costs provided are just basis, it may vary on the complexity of the design.
Several factors can affect the costs, such as location, soil condition and mode of construction.
This data should be useful in the early stages of the design process for understanding limitations and managing expectations.
The project cost will be accurately estimated based on the final design.
Other structures/components aside from the main structure/building are EXCLUDED in the said rates and will compute separately.
Professional fees, Construction permit fees, taxes and alike are also EXCLUDED in the said rate.
ALWAYS consult with an ARCHITECT for you plans and design to ensure to meet your specific space requirements and building needs.