Improper welding
Identifying Honeycomb
Check Rebar spacing(100mm) before casting
Construction site
Location identification of improper welding
Dismantle formwork identified
Inspecting onsite casting
Slump test (the slump was 70mm)
Location map
Before and after installation of pipe
Proposed location of water tank