The PBox and WME location shall be indicated on the installation drawings provided to the Site Project Manager. This section shall explain how to fix these enclosures and what to remove from them before doing so.
(*note: if in some cases the internal parts have to be protected during the anchoring process to avoid contamination, this should be done by VSM manufacturing team before delivery)