Preliminary Project Previews
For Contractor Use
For Contractor Use
KEY PROJECT HIGHLIGHTS
The Ibapah Road Safety and Rehabilitation project is located south of Wendover and consists of upgrading roadway features and pavement along 35 miles of roadway through portions of Juab and Tooele Counties.
For potential material sources contact Andy Bedingfield at State of Utah School and Institutional Trust Lands Administration (SITLA) at 801-538-5158 or abedingfield@utah.gov
Key elements include:
Guardrail and barrier
Signs and flexible delineators
Centerline rumble strips at various locations
Pavement marking
Small diameter drainage pipe installation
Driveway tie-ins (gravel and asphalt)
Approx. 18-miles In-place cold recycle (CIPR)
Highly modified asphalt (HMHMA) for entire project length
ANTICIPATED SCHEDULE
August 2025 Project Advertisement
Begin Construction per Contractor
Fall 2026 Complete Construction
QUESTIONS/COMMENTS
Send questions to Jessica Rice at jrice@utah.gov or call (801) 987-0531
Last updated: 7/9/2025
ALL INFORMATION PROVIDED IN UDOT PROJECT PREVIEWS IS FOR INFORMATION ONLY. ALL INFORMATION-ONLY MATERIAL IS NOT PART OF THE CONTRACT DOCUMENTS AND WILL NOT BE RELIED UPON. THE DEPARTMENT ACKNOWLEDGES THAT CONTRACTORS MAY ELECT TO USE THE INFORMATION AT ITS DISCRETION; HOWEVER, BOTH PARTIES AGREE THAT THE DEPARTMENT HAS NOT ANALYZED, GATHERED, OR DEVELOPED THE INFORMATION FOR ACCURACY OR SUFFICIENCY FOR USE, AND IT MAY INCLUDE ERRORS, OMMISSIONS, INCONSISTENCIES, INACCURACIES, DEFICIENCIES OR OTHER DEFECTS.