Week of 8/18/2025
North Exterior
Chemicals
Furniture
TA Training
Week of 7/25/2025
Nearing Completion
Furniture
Signage
Site Work
Historic Lamposts
Week of 6/30/2025
Art Glass
East Stairs
Metal Panels HH Entrance
Tutor Area Carpet
Snow Melt South Side
Week of 5/19/2025
Art Glass Prep
SE Site Work
Stair Work
3rd Floor Polished Flooring
Head House Flooring
Week of 4/14/2025
Curtain Glass Wall East
South Site Work
Interior Glass
Fourth Floor Lab Casework
Week of 3/17/2025
Second Floor Headhouse Windows
North Stair Soffit
South Stair Railing Install
Terazzo Floor
Week of 2/17/2025
Casework Installed in 2nd Floor Labs
Vestibule steel on East side of Building
First Punched Wndow in Historic Headhouse
Tile Installation in Bathrooms
Week of 1/6/2025
Curtainwall Glass Install
Fraser Hall Drone Photo
Lab in Headhouse
Transformer Delivery
Week of 12/03/2024
Curtainwall Glass
Ceilings in Lab
Penthouse Exhaust Fans
Precast at West Side
Week of 10/28/2024
General Purpose Classroom Tiers
New Roof From Tower Crane
West Side Window Installation
Casework
Week of 09/16/2024
Mechanical Penthouse Construction
Headhouse Lab Ductwork
Headhouse Exterior
South Stair Tower
Week of 08/12/2024
Hydrolift on the Headhouse South Side for Brick Infill
Drone View Looking toward Washingtown Avenue Bridge
Fifth Floor Level
Headhouse Level
Week of 06/14/2024
Loading Dock Area
View from E River Parkway
Third Floor Deck 1
North Side
Week of 05/13/2024
First Floor Concrete Pour
Headhouse Leb Space Second Floor
Second Floor Shoring Tables 1
Roof Demolition and New Roof Structural
Week of 04/01/2024
Concrete Slab in Headhouse LL Mech Space
Concrete Slab in Headhouse LL Mech Space
Concrete Slab Prep New Addition
Existing Classroom Ductwork Install
Week of 03/18/2024
Final Foundation Walls
First Concrete Slab Pour
First Concrete Slab Pour
First Concrete Slab Pour
Week of 03/11/2024
Framing in Headhouse
Final Foundation Wall Pour
Lab Waste Piping
View from Headhouse Classroom
Week of 02/19/2024
Underground Conduit in the Headhouse Basement
Metal Stud Framing of Beams on 2nd Floor
Columns in the New Addition
Columns in the New Addition
Week of 02/05/2024
Headhouse Ground Floor
New Addition
South Foundation Wall
South Foundation Wall + Column Rebar
Week of 01/22/2024
Headhouse Selective Demolition
Foundation Wall North Side
Foundation Wall Framing West
Foundation Walls
Week of 01/08/2024
Deep Foundation and Masonry Wall at Headhouse
Elevator Pit Slab
First Foundation Wall at Addition
New Addition
Week of 12/18/2023
Caissons for New Addition
Headhouse
Underpinning at Headhouse Foundation
Underpinning at Headhouse Foundation
Week of 12/04/2023
View from Walter Library
Prep for Drilling Caissons
Headhouse Excavation
Drill Rig
Week of 11/20/2023
Headhouse Basement
Tower Crane
Tower Crane
Tower Crane
Week of 11/06/2023
Basement Level Demolition
Tower Crane Pad
Tower Crane Base Close-up
Tower Crane Base
Week of 10/23/2023
Soil Excavation
Soil Excavation
Head House Selective Demolition
Remaining Section of Old Stacks Building
Week of 10/09/2023
Demolition of Library Stacks
Demolition of Library Stacks
View from Walter Library
View from East River Pkwy
Week of 09/25/2023
Old Law Library to New Lab
West Addition Demolished
Separation between Demo and Remaining
Pleasant Street Entrance
Week of 09/11/2023
Arlington Street Utility Work
Front Step Limestone Removal
West Addition mass demolition
West Addition mass demolition
Week of 08/28/2023
Temporary ADA Ramp at Appleby Hall Northeast corner
Existing Tower Crane Slab
Existing Sub-Floor
Brick Salvage
Week of 08/14/2023
Brick salvage at portion of building to be demolished
Concealed asbestos tile under an elevated floor
General purpose classroom
Headhouse
Week of 07/31/2023
Hydrolift on the Headhouse South Side for Brick Infill
Drone View Looking toward Washingtown Avenue Bridge
Mechanical Penthouse Construction
Headhouse Lab Ductwork