New York State school districts are required to work with professionals every five years to survey the infrastructure of their schools and develop facilities plans. These plans protect the taxpayers’ investments in the schools by identifying infrastructure issues early and planning for how to make long-term upgrades. KCSD's five-year Building Condition Survey was completed in 2020 and provided a roadmap for completing capital improvements across nine school buildings.
The survey was considered by a 30-member Facilities Committee – a Board of Education subcommittee that also includes teachers, maintenance staff, and administrators. The District's professional advisers, including architects from KSQ Design, helped determine which projects were priorities for a capital project that could coincide with the payoff of a past investment.
To provide equity of resources throughout the community, the Board adopted a plan to address all of those priority deficiencies. This approach also takes advantage of the financial savings associated with a large-scale effort.
All schools in the capital project proposition would gain the following improvements:
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Not included in this proposition:
Kingston High School, which just benefitted from a comprehensive renovation.
Meagher Preschool, where the building was improved in 2014 and 2017.
Proposed Capital Projects at our Middle Schools
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Extend two parking lots to alleviate severe parking shortage (80 cars +/-)
Install new water service main from Howland Avenue to lower parking lot
Mill and repave upper parking area
Resurface deteriorated sidewalks and curbs
Repave asphalt driveway
Replace all exterior windows/window walls, with cafeteria glazing to be mirrored
Reinforce gym divider/roof beam
Refurbish the loading dock at the kitchen, which serves all schools except KHS
Restore terrazzo steps throughout the building
Replace all interior wood doors and install ADA compliant hardware
Replace approx. 17,500 sf of roofing at Grade 5 and 6 wing and rooms 300 & 300A
Renovate bathrooms and add ADA features
Fully renovate kitchen including finishes and appliances
Relocate and renovate nurse's suite to include waiting area that allows for separation of boys and girls, and a private doctor's office
At our virtual forum, Bailey Principal Debra Fitzgerald explained some of the challenges the nurse’s suite faces in a school of about 1,000 students. Watch her talk about that at the 44-minutue mark of the forum’s recording.
Fully renovate auditorium including finishes, seats (625), rigging, and sound booth
Replace guardrail and handrail at all stairs with pickets no larger than 4 inches apart
Replace public address system
Install essential electrical outlets
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Add parking spaces
Improve exterior concrete landing to asphalt transitions (ADA)
Replace wood floor construction in Classroom 140B
Upgrade/replace elevator in Corridor C104
Replace misc. interior doors
Extend fire rated walls to underside of deck
Install ADA-compliant handrails at all stairs and exterior egress walkway
Update Science Rooms to meet ADA requirements
Add OT/PT office
Proposed Capital Projects at our Elementary Schools
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Add parking spaces
Improve site drainage
Replace exterior doors for Kindergarten classrooms
Upgrade door hardware (ADA)
Install new interior classroom doors
Upgrade bathrooms and add ADA features
Install essential electrical outlets
Upgrade theatrical lighting
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Add 22 new parking spaces
Add egress sidewalks
Add ADA-compliant entry doors
Rehabilitate bathrooms (ADA)
Install portable lift for stage access (ADA)
Replace interior doors
Renovate cafeteria
Install essential electrical outlets
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Upgrade pavement and sidewalk to meet ADA requirements
Replace windows throughout the building
Renovate bathrooms and add ADA features
Make miscellaneous ADA upgrades
Replace interior doors
Install interior stair handrails to meet ADA requirements
Replace miscellaneous VCT flooring
Install essential electrical outlets
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Create dedicated parent pick-up and bus drop off on campus
Upgrade/widen entry canopy
Enhance various sidewalks to meet ADA requirements
Upgrade various drainage systems
Build covered ramp to portable classroom
Replace misc. windows
Renovate bathrooms and add ADA features
Install portable lift for stage (ADA)
Renovate nurse’s office to meet ADA requirements
Replace interior doors
Install essential electrical outlets
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Build new ADA ramps from Wall St.
Improve Wash. Ave. campus play area that supports the neighborhood as a community asset
Repoint exterior masonry
Install new elevator
Install rescue windows
Make various ADA upgrades (misc. doors, door hardware, and railing upgrades)
Renovate bathrooms and add ADA features
Restore interior plaster
Fully renovate theater
Install essential electrical outlets
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Upgrade miscellaneous door hardware to meet ADA requirements
Replace interior handrails (ADA)
Provide portable lift for stage ADA access
Renovate bathrooms and add ADA features
Replace gym wall padding
Install essential electrical outlets
Replace ceilings and paint interiors
Install heating, ventilation, and air conditioning (HVAC)
Upgrade plumbing
Improve school entrances for greeting and security
Add 14 new parking spaces
Replace campus sidewalks to meet ADA requirements
Upgrade sanitary sewer system
Renovate 1939 floor structure
Resurface exterior wood soffit with metal
Replace windows in the 1959 building
Upgrade Kindergarten bathrooms
Replace interior doors
Replace VAT floor tile
Renovate bathrooms and add ADA features
Install essential electrical outlets