November 11, 2017:
Track Wire sensor (11/11)
November 15, 2017:
November 18, 2017:
November 20, 2017:
November 21, 2017:
November 27, 2017
From Top left clockwise: Beacon detector test (red LED on uno indicates a received signal), Tape Sensor readings on printed out, all of them show similar readings when on tape and when on the floor (except for the faulty ones mentioned earlier), track wire driver test (Red led indicates received signal)
LEFT: Servo Board RIGHT: Bumpers
December 2, 2017
Side shooter (video will be uploaded tomorrow (12/3)) ATM6 portion implemented