Under Florida Statute Chapter 471, professional engineering sign-off is legally required for public utility projects, but hiring a full-service CEI (Construction Engineering & Inspection) firm to provide field inspectors introduces massive engineering overhead multipliers. Municipalities can bypass these costly CEI contracts by keeping the statutory Engineer of Record (EOR) duties in-house with the City Engineer, while partnering with Triumph H2O as a specialized field QA/QC sub-consultant. Triumph H2O embeds senior, certified utility inspectors directly on-site to manage daily field observations, verify AWWA hydrostatic pressure and low-pressure sewer air testing, compile Daily Work Reports (DWRs), and assemble complete FDEP line clearance packages (Rules 62-555 and 62-604). The City Engineer maintains final review and sign-off authority, while Triumph H2O handles the labor-intensive field testing and inspection at approximately half the cost of a traditional CEI firm.
1. Construction Quality Assurance & Field Inspection (QA/QC)
Third-Party Utility Inspection: Full-time or milestone-based field oversight for Open-Cut excavations, Horizontal Directional Drilling (HDD), Pipe Bursting, Cured-In-Place Pipe (CIPP) main/manhole lining, lift station overhauls, and septic-to-sewer conversions.
Contract & Specification Compliance: Rigorous on-site verification that materials, pipe bedding, and installation procedures strictly conform to municipal technical standards and approved shop drawings.
Soil Density & Compaction Oversight: Monitoring subgrade, pipe zone, and backfill compaction testing to prevent pavement settlement and structural line sags.
Daily Work Reports (DWRs): Comprehensive digital logs detailing daily contractor activities, equipment on-site, weather conditions, field challenges, and exact installed quantities.
2. Regulatory Compliance & FDEP Line Clearance Management
Drinking Water Main Clearances (F.A.C. Rule 62-555):
Execution and oversight of AWWA C600 hydrostatic pressure testing (150+ PSI)
Supervision of AWWA C651 disinfection, continuous chlorination, high-velocity flushing, and total/free chlorine residual verification.
Bacteriological sampling management (2 consecutive sets taken 24–48 hours apart).
Compilation and submittal of complete clearance packages, including FDEP Form 62-555.900(9).
Wastewater Collection & Force Main Clearances (F.A.C. Chapter 62-604):
Low-Pressure Air Testing (ASTM C828) for gravity sewers and Vacuum Testing for manholes/wet wells.
Mandrel Deflection Testing deflection on flexible PVC gravity lines.
CCTV video reviews and PACP coding verification.
Preparation and submittal of FDEP Form 62-604.300(3)(b) completion documentation.
SWPPP & Environmental Inspections: FL-DEP certified Stormwater, Erosion, and Sediment Control site inspections, turbidity monitoring, and NPDES permit compliance logging.
3. Specialized Field Acceptance Testing & Diagnostics
Water Distribution Systems:
AWWA Hydrostatic Pressure & Leakage Testing.
Fire Hydrant Flow, Pressure & Operation Testing.
Valve Exercising, Locating & Valve Pad Inspection.
Electronic Locate Wire & Marker Ball Testing.
Sewer & Stormwater Networks:
Gravity Line Lamping & CCTV Pre/Post-Construction Video Reviews.
Smoke Testing to rapidly pinpoint inflow & infiltration (I&I) sources, cracked pipes, and illicit storm drain cross-connections.
Lift Station Drawdown & Pump Capacity Testing to evaluate wet-well inflow rates and pump performance.
4. Construction Administration & Financial Oversight Support
Contractor Pay Application Auditing: In-field quantity tracking and verification of pay requests to protect public funds against overbilling.
Schedule Tracking: Auditing contractor milestones against Capital Improvement Program (CIP) timelines to prevent project delays.
Redline & As-Built Drawing Verification: On-site validation of field redlines, sample points, and depth/elevation deviations prior to final record drawing certification.
5. Utility Maintenance & Optimization Programs
Valve Exercising & Hydrant Maintenance: Programmatic flushing, valve exercising, and maintenance logs to support AWWA distribution system health.
Unidirectional Flushing (UDF): Oversight and execution of UDF programs to reduce water age, clear sediment, and maintain proper disinfectant residuals.
Sewer & Storm Line Cleaning & CCTV Surveys: Diagnostic condition assessments prior to or following CIPP lining contracts.
Key Municipal Value Proposition
Half the Cost of Traditional CEI: Delivers senior-level technical inspection and regulatory clearance oversight at approximately 50% lower billing rates than full-service engineering firms. Our services can be used in adition to CEI firms for roadway and complete streets projects.
FSU Certified Public Manager (CPM) Leadership: Guided by formal public administration training that understands municipal budget stewardship, public asset protection, and seamless inter-departmental coordination.