Monday: Class work day and catch-up work for Q1
Tuesday: Printing ghost and headphones holder presentations
Wednesday: Improve ghost design and presentations of halloween projects.
Thursday: NO SCHOOL!!!
Friday: NO SCHOOL!!!
Monday: Cupcake reverse engineering.
Tuesday: Reverse engineer a wind-up toy.
Wednesday: Parts list for toy.
Thursday: toy disassembly and Franken-toy.
Friday: Finish reverse engineering project and update portfolio.
Monday: Learning tolerances and updating portfolios
Tuesday:more joint slides
Wednesday:more joint slides link: joinery project slides
Thursday: Work on exploded view in fuision
Friday:ER time yaaay!
Monday: Statistics practice
Tuesday: design catapult
Wednesday:team stuff
Thursday:work on catapult design
Friday: work on catapult design and drill use
Monday: Finish the multiview and exploded view parts list.
Tuesday: Print the catapult parts.
Wednesday: Assemble some of the parts.
Thursday: Fully assemble and testing the catapult.
Friday: Update portfolio and slideshow finishing. Catapult project
Monday: testing the catapult distances and replacing a rubber band
Tuesday: update the portfolio, slides, and add slide link Catapult project
Wednesday: we did our catapult presentations.
Thursday: mBot mega and roblox account what is an mBot mega
Friday:game testing and portfolio update
https://drive.google.com/file/d/1KSBHmXnE1KRzPUXUEy7PhL3PP10ag5ID/view?usp=sharing
Monday:bot workig with code
Tuesday: update the portfolio create mvement code
Wednesday: figure out how bot moves.
Thursday: mBot mega troubleshooting
Friday: bot fixing and some coding as well as portfolio update/
Monday: bot fixing and new code making for fixed bots.
Tuesday: bot code fixing and troubleshooting
Wednesday: study and work day on slides
Thursday: EOC and bot showdown and slideshow:mbot mega slides
Friday: EOC times no robotics.