The main floor over the summer of 2025 was refreshed with new wall paint and the usergroups removing their items to their designated areas. We also acquired a smart TV for casting and web access to make zoom conferencing and screen sharing for presentations easier. The kitchen was upgraded and certified as a commercial grade kitchen.
The Corporation and St. Francis Lodge No. 24 have worked together to renovate the basement of the building over the winter of 2024 to the summer of 2025. A new furnace and central air unit was installed in addition to a new on-demand hot water tank. A storage room has been created for a regular user group. The space has been gutted and reframed for the creation of a future conference room, archive & Library and washrooms.
The foundation and exterior of the main building was worked on in 2023 to repoint brickwork and improve overall drainage from rain and spring runoff.