In spite of the fact that there are a few waterproofing frameworks, the most well known is the one utilized for cladding the rooftops. Hence, we will portray the rules that you should adhere to waterproof the top of your home, business or building. (Μoνωσεις ταρατσων )
Additionally, assuming that you have chosen to waterproof yourself, we suggest:
Have somewhere around two days to finish the work.
Wear comfortable garments and a cap.
Try not to waterproof in the stormy season.
Surface Readiness
The principal stage in the waterproofing system is arrangement . From the outset, this stage could appear to be immaterial, in any case, it is the most important in light of the fact that it relies upon it that the waterproofing can carry out its role accurately. The means you should continue in this stage are (2):
Stage 1. Assessment of the chunk
The main thing is to analyze the surface. For this it is important that you think about the accompanying focuses:
Material surface: foil or concrete.
Region Geographic development: city, country, ocean side.
Circumstance in which it is: great, fair or awful.
Kind of dampness present, if any.
Cycles to which the surface has been oppressed: waterproofing or re-waterproofing.
Notwithstanding the past focuses, in the event that your rooftop is made of cement, you ought to ponder the downspouts. It is prescribed to have four of 4 '' per 100 m 2 with an incline of no less than 2%, so the water can run and keep away from puddles and stickiness issues.
The strategy depicted beneath applies to substantial roofs as it is the most broadly utilized material.
Stage 2. Scratching the piece (discretionary)
Assuming the chunk has been recently waterproofed, it is best to scratch the surface to eliminate the remaining parts of the past waterproofing and bogus grips. You can do this with a metal fiber brush or a digging tool. Be cautious while scratching since you can mesh or chip the piece.
Stage 3. Cleaning the section
The piece should be liberated from residue, oil and some other material that might forestall the right utilization of the waterproofing. By and large, tidying the piece is adequate to accomplish an up surface.
Stage 4. Fixing existing breaks
All breaks or gaps more prominent than 1 mm wide should be filled or caulked. The cycle comprises of opening the breaks in a "V" until a width of 0.5 cm is gotten, later it is cleaned and the relating fixing is put by the waterproofing to be utilized, with the assistance of a three-sided spatula.
Stage 5. Putting the seal on the piece
Prior to beginning with the position of the seal, you should mix the product until you get a homogeneous blend. Sealer position ought to start low on the chunk and work up.
Recollect not to weaken the sealer with water or some other sort of fluid, except if suggested by the provider. As a general rule, on the off chance that you do, its parts are probably going to be modified and the eventual outcome isn't what you need.
Stage 6. Treatment of basic places
Whenever you have applied the sealer, you ought to painstakingly audit the surface for the treatment of basic places. This interaction fluctuates as per the sort or nature of the waterproofing, so we suggest that you audit the provider's specialized sheet to utilize the right unambiguous cycle. https://www.monoscience.gr/monoseis-taratswn