Electric Brewery Build

Some of the build documents and pictures from our electric brewery construction

Early diagramming and planning

 Electric Sketch

 Piping connection sketch

 Fittings are attached by silver solder that was flowed by propane torch

 Inside view showing solder flow

 Fittings attached (some were later changed)

 We then wrapped the keg in insulation

 Fittings poking out from the insulation

Completed and cleaned up insulation work

 Building the control panel

 Completed panel ready to test

 

 First test fire

Demoing the equipment during our first brew day

Upgrading to camlock fittings

Upgrading to a pump and giving it a test!

In use, brewing a stout back in ~2017

Brewery assistant dog, Summer 2019

Brewing Summer 2019