Consultancy Project Funding: Details
Proof-Checking of the Structural Design and Modifications of Building no. 7, BHEL, Bangalore (Joint with Prof. Devdas Menon): 16/02/2006 to 31/10/2006, Agency: BHEL, Bangalore
Proof Checking the Design Calculation of Civil Structural Drawing of STP 100 KLD (Joint with Dr. G. R. Dodagoudar): 08/02/2010 to 31/08/2010, Agency: Reva Project Engineers
FEA Validation of Display Booth: 10/03/2010 to 31/12/2010, Agency: Silicon Valley Auto Components Private Limited, Chennai
Assessment of Strength of Dock Floor & Issue of Safety Certificate (Joint with Prof. R Sundaravadivelu): 05/03/2010 to 31/12/2010, Agency: Cochin Shipyard Limited, Cochin
Testing of Biaxial Hollow Slab (Joint with Dr. A. K. Sengupta): 04/01/2010 to 31/12/2010, Agency: Soundarya Decorators Pvt. Ltd.
Proof Checking of Structural Design of PEB Hangar for INS GARUDA at Kochi (Joint with Prof. R Sundaravadivelu): 25/10/2010 to 25/01/2011,Agency: Naval Base, Kochi
Certification of FE Analysis of 55 ft/113 ft Low/Flat Bed Trailer: 1/12/2011 to 1/5/2012, Agency: Namakkal Transport Carriers Private Ltd., Chennai
Vetting of structural design calculations and drawings for 15MLD water treatment plant at HAL: 10/05/2012 to 10/02/2013, Agency: Megha Engineering and Infrastructure Ltd., Hyderabad
Design proof checking of steel PEB hanger & foundation for BSF at Naval Air Station Arakkonam: 09/10/2012 to 08/04/2013, Agency: Vardhman Precision Profiles & Tubes Pvt. Ltd., New Delhi
Verification of Design calculation and Certification or Spreader Beam: 13/05/2013 to 12/05/2016,Agency: Namakkal Transport Carriers Private Limited
Anchorage Efficiency, Load Transfer, Sheating Pipe Testing: 18/11/2013 to 17/11/2014, Agency: GVR Infra Projects Limited
HTS Strands -Mechanical & Relaxation testing: 01/01/2014 to 31/12/2016,Agency: Simplex Infrastructures Limited, New Delhi
Proof Checking of Civil Design for 2x660 MW Suratgarh STPS Stage - V: 20/01/2014 to 19/01/2015,Agency: BHEL - PEM /Noida
Calibration of Proving Ring: 01/03/2014 to 28/02/2017,Agency: NFA Nungambakkam, Chennai 600 034
Vetting of structural Design of Swimming Poll and Allied works at INS Agrani Coimbatore: 17/04/2014 to 16/10/2014, Agency: Kochi Naval Base
Structural Vetting of “Baffle Range”: 17/04/2014 to 16/10/2014,Agency: Kochi Naval Base
Strain, Deflection & Vibration Measurement on Chasis of a 2 Axle Semi Trailer: 03/07/2014 to 02/01/2015,Agency: SIGT Private Limited
Strength and condition assessment of 300 M high RCC TV tower at HPT TV Rameswaram: 15/11/2014 to 14/05/2015,Agency: All India Radio
Vibration Analysis of Shopping Mall in Kochi: 01/01/2015 to 30/06/2015,Agency: Lulu International Shopping Mall Pvt Ltd
Vetting of structural designs drawings and providing structural stability certificates for 3 residential towers in Coimbatore, Tamilnadu 641035: 12/01/2015 to
05/07/2015, Agency: Alliance Mall Developers Co Pvt Ltd
Structural Stability Assessment of Fire Affected Building (Godown) at Bangalore: 11/02/2015 to 10/08/2015,Agency: Rank Surveyors Pvt Ltd, Chennai
Testing of Geogrids: 12/02/2015 to 11/08/2015, Agency: Z-Tech (India)
Vetting design & drawings of ROB structural design at KM55/228 of NH226: 13/02/2015 to 12/08/2015, Agency: National Highway Authority of India
Design validation of existing structure for solar panel fixing: 13/02/2015 to 12/08/2015, Agency: Asahi India Glass Ltd
Design and vetting of road crossing culvert at Arakkonam: 17/02/2015 to 16/08/2015, MRF Private Limited, Chennai
Inspection and structural testing of Kendriya Vidyalaya Coimbatore school building: 01-09-2014 to 01-09-2015, Agency: Kendriya Vidyalaya, Coimbatore
Design vetting of substructure & foundation of major bridge-New BG line- Southern Railway for major bridge at Ch. 16.424 m, Pandavaiyaru (Span 3´12.2 m) with bored piles of 1 m diameter: 10/09/2014 to 09/09/2015, Agency: GVR Infra Projects Ltd, Chennai
Design proof checking & vetting for civil structural design of natural draught cooling tower for 2´660 MW Suratgarh Super Thermal Power Station: 10/09/2014 to
09/09/2015, Agency: BGR Energy Systems Ltd, Chennai
Proof Checking of Design for the Multi Level car Parking at Infosys Campus in Mahindra Industrial Park Ltd, Mahindra City in Maraimalai Nagar: 16/03/2015 to
11/09/2015, Agency: Consolidated Construction Consortium Ltd, Chennai
Structural Stability testing of cold storage unit is located at Mundrigi, KIADB Indl. Area, Bangalore Road, Bellary: 19/03/2015 to 15/09/2015,Agency: Rank Surveyors Pvt Ltd, Chennai
Proof checking of design & drawings of bridges related to Kharsia to Dharamjaygarh railway project, Chattisgarh: 18/09/2014 to 17/09/2015, Agency: IRCON International Limited, New Delhi
Validation of Mill Bay Structure design by M/s Cethar Limited, Trichy considering the need for access and safe & reliable power plant design of 30 years – 2 × 350 MW coastal thermal power plant at Thamminapattinam Village, SPSR Nellore District, Andhra Pradesh: 23/06/2014 to 22/10/2015, Agency: TRACTEBEL Consulting Engineers Private Limited, Chennai
Approval and Vetting of Design and drawing of 80T ELL crane at Naval Shipyard, Visakhapatnam: 28/10/2014 to 27/10/2015,Agency: McNally Bharat Engineering Co. Ltd., Kolkata
HTS Prestressing Strands - Mechanical & Relaxation Testing: 18/11/2013 to 19/02/2018,Agency: Consolidated Construction Consortium Ltd, Chennai
Calibration of Proving Ring: 01/03/2014 to 28/02/2017, Agency: ITD Cementation India Limited, New Delhi 110034
Testing of Heavy Duty Tower for Ultimate Load Carrying Capacity: 23/06/2014 to 22/06/2017, Agency: Nig Enterprise, Mumbai
Hydraulic Jack Calibration: 01/08/2014 to 31/07/2017,Agency: L&T Construction, Chennai
Analysis of Raw Water Reservoir Leakage Issue at Bhubaneshwar Power & Recommendations on remedial: 30-04-2015 To 26-04-2016, Agency: Bhubaneshwar Power Pvt Ltd
Condition Assessment of Concrete in the Reinforced Concrete Structural Elements of the Phase I Building: 31-10-2015 To 30-04-2016, Agency: Smart City Kochi Infrastructure Pvt Ltd
REVIEW OF "CONDITION ASSESSMENT REPORT ON CIVIL STRUCTURES OF 1 X 350MW THERMAL POWER PROJECT OF KVK: 21-05-2015 To 16-05-2016, Agency: KVK NILACHAL POWER PVT LTD
Static & Dynamic Load test with Tendon-Anchorage Assembly (according to IS 1343-2012): 25-05-2015 To 20-05-2016, Agency: RETECH GEOSYNTHETICS
Vetting the Design of Raw Water Reservoir wall: 24-11-2015 To 23-05-2016, Agency: BGR Energy Systems Limited
Design Validation of the Existing Structures at Your Bawal Plant (Haryana) for Solar Panel Fixing: 25-11-2015 To 24-05-2016, Agency: Asahi India Glass Ltd.
Testing of Anchorage Assembly,HTS Strands, Corrugated HDPE Sheating ducts: 01-06-2015 To 30-05-2016, Agency: PWD Puducherry
Testing Charges of Pot Bearings in Accordance with IRC 83 (Part III)-2002 Specifications: 15-12-2015 To 14-06-2016, Agency: Poly Fluoro Ltd
Review of NDT Test Results Submitted by BHEL for TG Column and Deck Slab: 15-12-2015 To 14-06-2016, Agency: Bharat Heavy Electricals Ltd
Pull Out Tests on Ripple Anchor Fasteners: 30-12-2015 To 29-06-2016, Agency: Ripple Construction Products Pvt Ltd
Vetting of Design & Drawing of Pandavaiyaru Bridge at Chainage 16424m: 06-07-2015 To 30-06-2016, Agency: GVR Infra Projects Ltd
Proof checking of Design and drawings of drawings of the proposed PEB structure at ITI Palakad, Kerala: 01-07-2015 To 30-06-2016, Agency: FLOREAT BUILDING SYSTEMS PVT LTD
Checking structural stability study of RCC over head water tank at Ambur municipality: 06-01-2016 To 05-07-2016, Agency: Ambur Municipal Corporation
Proof Checking & Vetting of Design & Drawings for Wagon Loading Station for CPCL: 06-01-2016 To 05-07-2016, Agency: McNally Bharat Engineering Co. Ltd.
Conducting Detailed investigation for the Structural Safety of Tv Tower at Ananthapur: 19-01-2016 To 18-07-2016, Agency: All India Radio
Structural Design of Foundation, Pier and Deck Slab for Widening of Road at Ayiramthengu, Kayankulam: 27-01-2016 To 26-07-2016, Agency: Central Public Works Department
Conducting Third Party Quality Assurance (TPQA) for Construction of School Building at Kendriya Vidyalaya: 12-02-2016 To 11-08-2016, Agency: Hindustan Steelworks Construction Ltd.
Check the Building Stability of Madura Coats Private Limited Tuticorin Mill Compound: 17-08-2015 To 16-08-2016, Agency: MADURA COATS PRIVATE LIMITED
Reviewing & vetting structural, civil drawings & design calculation of gallery and trestles of belt: 24-02-2016 To 23-08-2016, Agency: McNally Bharat Engineering Co. Ltd.
Structural soundness of Bank of India, Zonal Office premises located at Star House, No. 30, Errabalu Street, Chennai – 600 00: 25-08-2015 To 24-08-2016, Agency: BANK OF INDIA
Inspection of the cracks in the piers and pedestals of Bridge between Dhola & Sadiya Ghats and analysis of the same: 27-08-2015 To 26-08-2016, Agency: NAVAYUGA DHOLA INFRA PROJECTS PVT LTD
Testing of Post Tensioning Accessories: 27-08-2015 To 26-08-2016, Agency: PUBLIC WORKS DEPARTMENT, PUDUCHERRY
Vetting of Structural Design & Drawings of Kalyana Mandapam, Entrance Gate, South Gate Parking: 01-09-2015 To 01-09-2016, Agency: WADIA TECHNO ENGINEERING SERVICES LIMITED
Checking & Certification of Structural Adequacy of Rail Supporting System-OPGCL- Track hopper: 01-09-2015 To 01-09-2016, Agency: BGR ENERGY SYSTEMS LTD
Structural Stability study and analysis of IBS office building at Thiruvananthapuram: 16-09-2015 To 15-09-2016, Agency: IBS SOFTWARE SERVICES PRIVATE LIMITED
Design verification of sandwich panels: 22-09-2015 To 23-09-2016, Agency: RINAC INDIA LTD
Proof Checking of Turnout Design, Derailing Switch and Switch Expansion Joint: 25-09-2015 To 24-09-2016, Agency: VOESTALPINE VAE VKN INDIA PVT LTD
Consultancy Charges for Analysis of Charriflocculator Grade slab failure & recommendations: 17-04-2015 To 13-10-2016, Agency: Meenakshi Energy Private Limited
Checking Design Adequacy of Slab & Columns based on Core Sample Results & NDT Report: 19-10-2015 To 18-10-2016, Agency: Coromandel Engineering Co.Ltd
Structural Proof Checking of Proposed Krishna Lila Theme Park: 10-03-2016 To 09-03-2017, Agency: Krishna Lila Park-Iskcon Bangalore
Checking & Vetting of design and drawings of Major Bridge 98, Major Bridge 104, Multi-Cell Box Culvert: 21-03-2016 To 20-03-2017, Agency: Vijay Nirman Company P. Ltd.
Assessing feasibility of erection of 100m guyed mast at Doordarshan HPT Mahabubnagar: 16-03-2016 To 15-03-2018, Agency: All India Radio
Static Load test with Tendon-Anchorage Assembly (according to IS 1343-2012): 01-10-2015 To 01-04-2016, Agency: PUBLIC WORKS DEPARTMENT
Vetting of Design & Drawing of coal conveyor system: 01-07-2015 To 31-12-2015, Agency: KRISHNAPATNAM PORT COMPANY LIMITED
Checking the stability/strength of sheds in Taloja (T-16) plant to install solar panels: 01-07-2015 To 31-12-2015, Agency: ASAHI INDIA GLASS LIMITED
Determination of Relaxation and Mechanical Properties of the High tension Pre-stressing wires: 01-06-2015 To 30-11-2015, Agency: Freyssinet Menard India Pvt Ltd
PROOF CHECKING OF "BRIDGE ACROSS RIVER MULLAIYAR IN NH 45 A AT CH 178/100 IN KARAIKAL": 21-05-2015 To 16-11-2015, Agency: PUBLIC WORKS DEPARTMENT
PROOF CHECKING OF "BRIDGE ACROSS RIVER VANJIAR AT DOWNSTREAM OF EXISTING LEMAIRE BRIDGE CONNECTING: 21-05-2015 To 16-11-2015, Agency: PUBLIC WORKS DEPARTMENT
Proof Checking of Design for the Multi Level Car Parking at Jammu: 01-05-2016 To 30-04-2017, Agency: Consolidated Construction Consortium Ltd
Proof Checking of Structural Design of Multi-Storied Building: 03-05-2016 To 02-05-2017, Agency: Asas Muscat International Projects LLC
Conducting Non Destructive/Partially Destructive Tests(NDT/PDT) on RCC Abutments of Khaltse Bridge: 03-05-2016 To 02-05-2017, Agency: BRO Project Vijayak
Structural Soundness/ Condition Assessment of Concrete in RC Structural elements of Various Blocks: 09-05-2016 To 08-05-2017, Agency: Military Engineering Services
Testing of Turnout Sleeper: 16-03-2016 To 15-03-2018, Agency: Voestalpine VAE VKN India Pvt Ltd