Reliability / Quality

International Journal

  • Aslam, M., M. Azam, and Chi-Hyuck Jun, “A New Lot Inspection Procedure Based on exponentially weighted moving average”, International Journal of Systems Science, 46(8), 1392-1400, January 2015

  • Aslam, M., S. Balamurali, M. Azam, G.S. Rao, and Chi-Hyuck Jun, “Mixed Multiple Dependent State Sampling Plans Based on Process Capability Index”, Journal of Testing and Evaluation, 43(1), 171-178, January 2015

  • Yen, C.-H., M. Aslam and Chi-Hyuck Jun, “A Lot Inspection Sampling Plan Based on EWMA Yield Index”, International Journal of Advanced Manufacturing Technology, 75(5-8), 861-868, November 2014

  • Ahmad, L., M. Aslam, and Chi-Hyuck Jun, “Coal quality monitoring with improved control charts”, European Journal of Scientific Research, 125(2), 427-434, Oct 2014

  • Aslam, M., C.-W. Wu, M. Azam and Chi-Hyuck Jun, “Mixed Acceptance Sampling Plans for Product Inspection Using Process Capability Index”, Quality Engineering, 26(4), 450-459, Aug. 2014

  • Lee, Sang-Ho, Jang-Ho Park and Chi-Hyuck Jun, “An Exponentially Weighted Moving Average Chart Controlling False Discovery Rate”, Journal of Statistical Computation and Simulation, 84(8), 1830-1840, August 2014

  • Aslam, M., M. Azam and Chi-Hyuck Jun, “A New Exponentially Weighted Moving Average Sign Chart Using Repetitive Sampling”, Journal of Process Control, 24, 1149-1153, July 2014

  • Aslam, M., N. Khan, and Chi-Hyuck Jun, “A Multiple Dependent State Control Chart Based on Double Control Limits”, Research Journal of Applied Sciences, Engineering and Technology, 7(21), 4490-4493, June 2014.

  • Aslam, M. N. Khan, M. Azam and Chi-Hyuck Jun, "Designing of a New Monitoring T-Chart Using Repetitive Sampling", Information Sciences, 269, 210-216, June 2014.

  • Aslam, M., G. Srinivasa Rao, N. Khan and Chi-Hyuck Jun, “SkSP-V sampling plan for the exponentiated Weibull distribution”, Journal of Testing and Evaluation, 42(3), 687-694, May 2014

  • Ahmad, L., M. Aslam and Chi-Hyuck Jun, "Designing of X-Bar Control Charts Based on Process Capability Index using Repetitive Sampling", Transactions of the Institute of Measurement and Control, 36(3), 367-374, May 2014.

  • Aslam, M., S. Balamurali, M. Azam, and Chi-Hyuck Jun, “Skip-Lot Sampling Plan of Type SkSP-2 with Two-Stage Group Acceptance Sampling Plan as Reference Plan", Communications in Statistics - Simulation and Computation, 43(4), 777-789, April 2014.

  • Aslam, M., Chi-Hyuck Jun, A. J. Fernández, M. Ahmad and M. Rasool, “Repetitive Group Sampling Plan Based on Truncated Tests for Weibull Models”, Research Journal of Applied Sciences, Engineering and Technology 7(10): 1917-1924, March 2014

  • Aslam, M., M. Azam, and Chi-Hyuck Jun, "New attributes and variables control charts under repetitive sampling", Industrial Engineering & Management Systems, 13(1), 101-106, March 2014.

  • Aslam, M., Ching-Ho Yen, Chia-Hao Chang and Chi-Hyuck Jun, "Multiple Dependent State Variable Sampling Plans with Process Loss Consideration", International Journal of Advanced Manufacturing Technology, 71(5-8), 1337-1343, March 2014

  • Hussain, J., M. Aslam and Chi-Hyuck Jun, “Inspection of Batches Through Skip-R Lot Sampling Plan”, Journal of Testing and Evaluation, 42(2), 437-443, March 2014.

  • Aslam, M., M. Azam and Chi-Hyuck Jun, “A Mixed Repetitive Sampling Plan Based on Process Capability Index”, Applied Mathematical Modelling, 37(24), 10027-10035, December 2013.

  • Aslam, M., Ching-Ho Yen, Chia-Hao Chang and Chi-Hyuck Jun, “Multiple States Repetitive Group Sampling Plans with Process Loss Consideration”, Applied Mathematical Modelling, 37(20-21), 9063-9075, November 2013.

  • Aslam, M., Chi-Hyuck Jun, M. Ahmad, “A Repetitive Type of Group Acceptance Sampling Plan for Assuring the Percentile Life “, Pakistan Journal of Statistics, 29(4), 389-400, October 2013.

  • Aslam, M., Y.L. Lio and Chi-Hyuck Jun, “Repetitive acceptance sampling plans for burr type XII percentiles”, International Journal of Advanced Manufacturing Technology, 68, 495-507, September 2013.

  • Aslam, M., Chien-Wei Wu, Chi-Hyuck Jun, M. Azam and N. Itay , “Developing A Variables Repetitive Sampling Plan Based on Process Capability Index Cpk with Unknown Mean and Variance”, Journal of Statistical Computation and Simulation, 83(8), 1507-1517, Aug. 2013.

  • Aslam, M., M. Azam, Y.L. Lio and Chi-Hyuck Jun, “Two-Stage Group Acceptance Sampling Plan for Burr Type X Percentiles”, Journal of Testing and Evaluation, 41(4), 525-533, July 2013.

  • Aslam, M., S. Balamurali, Chi-Hyuck Jun, and M. Ahmad, “Optimal Design of Skip Lot Group Acceptance Sampling Plans for the Weibull Distribution and the Generalized Exponential Distribution”, Quality Engineering, 25(3), 237-246, June 2013.

  • Aslam, M. and Chi-Hyuck Jun, “Designing of Time Truncated Acceptance Sampling Plans by Using Two-point Approach”, Electronic Journal of Applied Statistical Analysis, 6(1), 18-31, May 2013.

  • Aslam, M., S. Balamurali, Chi-Hyuck Jun and M. Ahmad, “SkSP-V Sampling Plan with Group Sampling Plan as Reference Based on Truncated Life Test under Weibull and Generalized Exponential Distributions”, Pakistan Journal of Statistics, 29(2), 217-230, April 2013.

  • Aslam, M., M. Azam and Chi-Hyuck Jun, “Multiple Dependent State Sampling Plan Based on Process Capability Index”, Journal of Testing and Evaluation, 41(2), 340-346, March 2013.

  • Aslam, M., M. Azam and Chi-Hyuck Jun, “Decision Rule Based on Group Sampling Plan Under the Inverse Gaussian Distribution”, Sequential Analysis, 32(1), 71-82, Feb. 2013.

  • Aslam, M., C.-W. Wu, M. Azam, and Chi-Hyuck Jun, “Variable sampling inspection for resubmitted lots based on process capability index Cpk for normally distributed items”, Applied Mathematical Modelling, 37(3), 667-675, February 2013.

  • Aslam, M., S. Balamurali, C.-H. Jun and M. Rasool, “Optimal Designing of Skip-lot Sampling Plan of Type SkSP-2 with Group Acceptance Sampling Plan as Reference Plan under Burr-Type XII Distribution”, Journal of Statistical Computation and Simulation, 83(1), 37-51, January 2013.

  • Park, Jang-Ho and Chi-Hyuck Jun, “Multivariate process control chart for controlling the false discovery rate”, Industrial Engineering & Management Systems, 11(4), 385-389, December 2012.

  • Aslam, M., M. Azam and Chi-Hyuck Jun, “Tightened-normal-tightened group acceptance sampling plan for assuring percentile life”, Industrial Engineering & Management Systems, 11(4), 390-396, December 2012.

  • Aslam, M., S. Balamurali, Chi-Hyuck Jun and M. Ahmad, “Bayesian Sampling Inspection for Resubmitted Lots Under Gamma-Poisson Distribution", Research Journal of Applied Sciences, Engineering and Technology, 4(23), 5171-5176, December 2012.

  • Aslam M., Balamurali S., Jun C-H., Ahmad M., Rasool M. “Designing of Group Sampling Plans Based on Gamma-Poisson Distribution”, Journal of Testing and Evaluation, 40(6), 939-944, November 2012.

  • Aslam, M., C.-H. Yen, C.-H. Chang, C.-H. Jun, M. Ahmad and M. Rasool, “Two-stage Variables Acceptance Sampling Plans Using Process Loss Functions" Communications in Statistics-Theory and Methods, 41(20), 3633-3647, September 2012.

  • Aslam, M., M. Azam, S. Balamurali and Chi-Hyuck Jun, “A New Mixed Acceptance Sampling Plan based on Sudden Death Testing under the Weibull Distribution", Journal of the Chinese Institute of Industrial Engineers, 29(6), 427-433, September 2012.

  • Lee, Sang-Ho and C.-H. Jun, “A Process Monitoring Scheme Controlling False Discovery Rate”, Communications in Statistics-Simulation and Computation, 41(10), 1912-1920, Aug 2012.

  • Aslam, M., S. Balamurali, C.-H. Jun, M. Ahmad and M. Rasool, “Optimal Designing of an SkSP-V Skip-lot Sampling Plan With Double-Sampling Plan as the Reference Plan", International Journal of Advanced Manufacturing Technology, 60, 733-740, May 2012.

  • Aslam, M., Y.L. Lio, M. Azam, and Chi-Hyuck Jun, “Two-stage improved group plans for Burr type XII distributions”, American Journal of Mathematics and Statistics, 2(3), 33-39, May 2012.

  • Balamurali, S., M. Aslam and Chi-Hyuck Jun, “Bayesian double sampling plan under Gamma-Poisson distribution”, Research Journal of Applied Sciences, Engineering and Technology, 4(8), 949-956, April 2012.

  • Wu, C.-W., M. Aslam and Chi-Hyuck Jun, “Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk”, European Journal of Operational Research, 217(3), 560-566, March 2012.

  • Lee, Sang-Ho, M. Aslam, and Chi-Hyuck Jun, “Repetitive Group Sampling Plans with Double Specification Limits”, Pakistan Journal of Statistics, 28(1), 41-57, Jan. 2012

  • Aslam, M., S. Balamurali, C.-H. Jun, M. Ahmad and M. Rasool, “An optimal design of a skip lot sampling plan of type V by minimizing average sample number”, Pakistan Journal of Statistics, 28(1), 131-140, Jan. 2012.

  • Aslam, M., Chi-Hyuck Jun and M. Ahmad, “A two-stage group sampling plan based on truncated life tests for a general distribution”, Journal of Statistical Computation and Simulation, 81(12), 1927-1938, December 2011.

  • Aslam, M., Chi-Hyuck Jun, Y.L. Lio, M. Ahmad, and M. Rasool, “Group Acceptance Sampling Plans for Resubmitted Lots under Burr-type XII Distributions”, Journal of the Chinese Institute of Industrial Engineers, 28(8), 606-615, December 2011.

  • Aslam, M. Ching-Ho Yen and Chi-Hyuck Jun, “Variable repetitive group sampling plans with process loss consideration”, Journal of Statistical Computation and Simulation, 81(11), 1417-1432, November 2011.

  • Aslam, M., M. Shoaib, Chi-Hyuck Jun and N. Saeed, “Time truncated group acceptance sampling plans for lifetime percentiles under generalized log-logistic distributions”, International Journal of Current Research and Review, 3(11), 23-35, November 2011

  • Aslam, M., C.-H. Jun, Y.L. Lio, and M. Ahmad, “Group acceptance sampling plans for the generalized Rayleigh distribution”, International Journal of Intelligent Technologies & Applied Statistics, 4(3), 355-365, September 2011.

  • Aslam M., D. Kundu, Chi-Hyuck Jun, M. Ahmad, “Time Truncated Group Acceptance Sampling Plans for Generalized Exponential Distribution”, Journal of Testing and Evaluation, 39(4), 671-677, July 2011.

  • Balamurali, S. and Chi-Hyuck Jun, ”A New System of Skip-lot Sampling Plans Having a Provision for Reducing Normal Inspection”, Applied Stochastic Models in Business and Industry, 27(3), 348-363, June 2011.

  • Fernandez, A. J., C. J. Perez-Gonzalez, M. Aslam and Chi-Hyuck Jun, “Design of progressively censored group sampling plans for Weibull distributions: An optimization problem”, European Journal of Operational Research, 211(3), 525-532, June 2011.

  • Aslam, M., Shoaib, M., Lio, Y., Jun, C.-H., “Improved Group Acceptance Sampling Plan for Marshall-Olkin Extended Lomax Distribution Percentiles”, International Journal of Current Research and Review, 3(6), 10-25. June 2011.

  • Aslam, M., S.-R. Huang, Chi-Hyuck Jun, M. Ahmad and M. Rasool, “A reliability sampling plan based on progressive interval censoring under Pareto distribution of second kind”, Industrial Engineering & Management Systems, 10(2), 154-160, June 2011.

  • Aslam, M, Chi-Hyuck Jun, and M. Ahmad, “New acceptance sampling plans based on life tests for Birnbaum–Saunders distributions”, Journal of Statistical Computation and Simulation, 81(4), 461-470, April 2011.

  • Aslam, M., Chi-Hyuck Jun, Hyeseon Lee, M. Ahmad and M. Rasool, “Improved group sampling plans based on time-truncated life tests”, Chilean Journal of Statistics, 2(1), 85-97, April 2011.

  • Aslam, M., S. Balamurali, Chi-Hyuck Jun and M. Ahmad, “Optimal designing of a skip lot sampling plan by two point method”, Pakistan Journal of Statistics, 26(4), 585-592, Oct. 2010.

  • Lee, Sang-Ho and Chi-Hyuck Jun, “A new control scheme always better than X-bar chart”, Communications in Statistics – Theory and Methods, 39(19), 3492-3503, Sept 2010.

  • Aslam, M., Chi-Hyuck Jun and M. Ahmad, “Design of a time-truncated double sampling plan for a general distribution” Journal of Applied Statistics, 37(8), 1369-1379, Aug 2010.

  • Aslam, M., S. Balamurali, Chi-Hyuck Jun and M. Ahmad, “A new variables sampling plan for life testing in a continuous process under Weibull distribution”, Pakistan Journal of Statistics, 26(3), 539-546, July 2010.

  • Aslam, M., Chi-Hyuck Jun and M. Ahmad, “A double sampling plan for a reliability demonstration test”, Journal of Statistical Theory and Applications, 9(2), 295-309, June 2010.

  • Jun, Chi-Hyuck, Hyeseon Lee, Sang-Ho Lee and S. Balamurali, “A variables repetitive group sampling plan under failure-censored reliability tests for Weibull distribution”, Journal of Applied Statistics, 37(3-4), 453 – 460, March-April 2010.

  • Aslam, M. and Chi-Hyuck Jun, “A Double Acceptance Sampling Plan for Generalized Log-Logistic Distributions with Known Shape Parameters”, Journal of Applied Statistics, 37(3-4), 405 – 414, March-April 2010.

  • Aslam, M., S. Balamurali, Chi-Hyuck Jun and M. Ahmad, “A two-plan sampling system for life testing under Weibull distribution”, Industrial Engineering & Management Systems, 9(1), 54-59, March 2010.

  • Balamurali, S. and Chi-Hyuck Jun, "Designing of variables two plan system by minimizing the average sample number", Journal Applied Statistics, 36(10), 1159-1172, Oct. 2009.

  • Aslam, M. and Chi-Hyuck Jun, “A Group Acceptance Sampling Plan for Truncated Life Test Having Weibull Distribution”, Journal of Applied Statistics, 36(9), 1021-1027, September 2009.

  • Aslam, M., Chi-Hyuck Jun and M. Ahmad , “A Group Sampling Plan based on Truncated Life Test for Gamma Distributed Items" , Pakistan Journal of Statistics, 25(3), 333-340, July 2009.

  • Aslam, M., Chi-Hyuck Jun and M. Ahmad, “A Double Acceptance Sampling Plan Based on Truncated Life Tests in the Weibull Model”, Journal of Statistical Theory and Applications, 8(2), 191-206, June 2009.

  • Aslam, M. and Chi-Hyuck Jun, “Group Acceptance Sampling Plans for Truncated Life Tests based on the Inverse Rayleigh and Log-logistic Distributions”, Pakistan Journal of Statistics, 25(2), 107-119, April 2009.

  • Balamurali, S., Chi-Hyuck Jun and Il-gyo Chong, "A New Hybrid Reliability Sampling System for Exponential Lifetime Distributions", Journal of Applied Statistical Science, 16(3), September 2007, 365-376.

  • Balamurali, S. and Chi-Hyuck Jun, “Multiple Dependent State Sampling Plans for Lot Acceptance Based on Measurement Data”, European Journal of Operational Research, 180, 1221-1230, Aug. 2007.

  • Jun, Chi-Hyuck, S. Balamurali and M. Kalyanasundaram, "Evaluation and design of two level continuous sampling plans", Tamkang Journal of Science and Engineering, 9(4), 409-417, December 2006.

  • Jun, Chi-Hyuck, S. Balamurali, and Sang-Ho Lee, "Variables sampling plans for Weibull distributed lifetimes under sudden death testing”, IEEE Transactions on Reliability, 55(1), 53-58, March 2006.

  • Balamurali, S. and Chi-Hyuck Jun, “Repetitive group sampling procedure for variables inspection”, Journal of Applied Statistics, 33(3), 327-338, April 2006.

  • Balamurali, S. and Chi-Hyuck Jun, “Average Outgoing Quality of CSP-C Continuous Sampling Plan under Short Run Production Processes”, Journal of Applied Statistics, 33(2), 139-154, Mar. 2006.

  • Balamurali, S., H. Park, C.-H. Jun, K.-J. Kim, and J. Lee, "Designing of variables repetitive group sampling plan involving minimum average sample number", Communications in Statistics - Simulation and Computation, 34 (3), Oct. 2005, 799-809.

  • Ko, Young-Hyun, Kwang-Jae Kim and Chi-Hyuck Jun, “A new loss function-based method for multiresponse optimization”, Journal of Quality Technology, 37(1), 50-59, Jan. 2005.

  • Balamurali, S., M. Kalyanasundaram and Chi-Hyuck Jun, “Generalized CSP-(C1, C2) sampling plan for continuous production processes”, International Journal of Reliability, Quality and Safety Engineering, 12(2), 75-93, April 2005.

  • Balamurali, S. and Chi-Hyuck Jun, “Modified CSP-T Sampling Procedures for Continuous Production Processes”, Quality Technology & Quantitative Management, 1(2), 175-188, Sep. 2004.

  • Park, Kwang-Su and Chi-Hyuck Jun , “Semiconductor yield models using contagious distributions and their limiting forms”, Computers & Industrial Engineering, Vol. 42 (2-4) pp. 115-125, April 2002.

  • Park, Kwang-su and Chi-Hyuck Jun, “A Bayesian Approach to the Optimal Policy under Imperfect Preventive Maintenance Models”, Chapter 8, in RECENT ADVANCES IN RELIABILITY AND QUALITY ENGINEERING (editor: Hoang Pham), World Scientific, Singapore, 2001, pp.123-136.

  • Yeo, Kunmin and Chi-Hyuck Jun, "Analysis of System Lifetime Subject to Two Classes of Random Shocks", International Journal of Reliability and Application, 1, 1, 49-64, 2000

  • Park, Kwang-su and Jun, Chi-Hyuck, "Use of Contagious Distribution in the Semiconductor for Yield Models considering Cluster Effect", Communications in Statistics: Theory and Methods 29.1,1~17, 2000

  • Jun, Chi-Hyuck, Soo Y. Chang, Yushin Hong, and Heejoong Yang, "A Bayesian Approach to Prediction of System Failure Rates by Criticalities Under Event Trees", International Journal of Production Economics, 60-61, 623-628, 1999

  • Jun, Chi-Hyuck, Yushin Hong, Soo Young Kim, Kwang-Su Park and Hangyeob Park, "A Simulation-based Semiconductor Chip Yield Model Incorporating a New Defect Cluster Index", Microelectronics Reliability, 39, 451-456, 1999

  • Jun, Chi-Hyuck and Suk Hwan Suh, "Statistical Tool Breakage Detection Schemes Based on Vibration Signals in NC Milling", International Journal of Machine Tools & Manufacture, 39, 1733-1746, 1999.

  • Suh, Jae-Joon, Han, Chi-Moon and Jun, Chi-Hyuck, "System Reliability Estimation Using Simulation Combined with Network Reductions", Microelectronics & Reliability, 36, 9, 1263-1267, 1996

  • Choi, Moon Soo and Jun, Chi-Hyuck, "Some Variants of Polygon-to-Chain Reductions in Evaluating Reliability of Undirected Network", Microelectronics and Reliability, 35, 1, 1-11, 1995

  • Choi Moon Soo and Jun, Chi-Hyuck, "Terminal-Pair Reliability of Network System Using Flow Augmenting Path Search Algorithm", Microelectronics and Reliability, 34, 6, 999-1012, 1994.

  • Jun, Chi-Hyuck and Choi Moon Soo, "Average Run Lengths of a Control Chart Based on the Sum of Squared Errors", Computers & Industrial Engineering, 27, 349-352, 1994.

  • Jun, Chi-Hyuck and Choi Moon Soo, "Simulating the Average Run Length for CUSUM Schemes Using Variance Reduction Techniques", Communications to Statistics - Simulation and Computation, 22, 877-887, 1993.

  • Jun, Chi-Hyuck and S.M. Ross, "System Reliability by Simulation: Random Hazards Versus Importance Sampling", Probability in Engineering and Informational Sciences, 6, 119-126, 1992.

Domestic Journal

  • 이상호, 이혜선, 김윤대, 전치혁, “브랜드 선택확률 분석을 위한 구조방정식 모형”, 대한산업공학회지, 36(2), 87-93, May 2010.(Estimation of a structural equation model including brand choice probabilities)

  • Aslam, M., M.K. Pervaiz and C.-H. Jun, “An improved group sampling plan based on time-truncated life tests”, Communications of the Korean Statistical Society, 17(3), 319-326, May 2010.

  • Aslam, M., Chi-Hyuck Jun, M. Rasool and M. Ahmad, “A Time Truncated Two-Stage Group Sampling Plan for Weibull Distribution”, Communications of the Korean Statistical Society, 17(1), 89-98, Jan. 2010.

  • 권준범, 이종석, 이상호, 전치혁, 김광재, “공정변수의 변동을 고려한 손실함수를 통한 다중반응표면 최적화”, 대한산업공학회지, 31(2), 164-172. 2005.6.

  • 권준범, 이종석, 이상호, 전치혁, 김광재, “공정변수의 변동을 고려한 호감도함수를 통한 다중반응표면 최적화”, 한국경영과학회지, 30(1), 95-104, 2005.3.

  • 박희곤, 문영건, 전치혁, S. Balamurali, 이재욱, “평균샘플수 최소화를 통한 계량형 반복샘플링검사의 설계”, 대한산업공학회지, 30, 3, 205-212, 2004.9.

  • 송홍준, 전치혁, “다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출”, 산업공학, 16(1), 27-33, 2003.3.

  • 전치혁, 염세경, “소수의 고장데이터를 갖는 부품의 수명분석 및 예비품수 결정”, 신뢰성응용연구, 1, 2, 139-148, 2001.10.

  • 김영호, 정일교, 전치혁, “예산제약하에서의 동시조달수리부속의 적정소요 산출”, 산업공학, 14, 3, 286-295, 2001.9.

  • 전치혁, 박광수, 황욱연, 주민보, "최소수리를 갖는 정기정비정책하에서의 고장률 추정 및 정비주기 산정: K 제철소 사례", 대한설비관리학회지, 3, 1, 217-228, 1998.

  • 박광수, 전치혁, 김수영, "반도체 제조업에서 사용되는 수율모델의 비교 및 이용 ", 산업공학, 10, 1, 79-93, 1997.

  • 박항엽, 전치혁, 홍유신, 김수영, "변동계수를 이용한 반도체 결점 클러스터지표 개발 및 수율예측", 대한산업공학회지, 21, 3, 371-386, 1995.

  • 서재준, 전치혁, "시뮬레이션과 네트워크 축소기법을 이용한 네트워크 신뢰도 추정", 전자통신, 14권 4호, 1993, 19-27.

  • 전치혁, 양희중, 장수영, 정의승, 임혜란, "베이지안기법에 의한 임무 신뢰도 예측", 한국경영과학회지, 18, 1, 71-78, 1993.

  • 박상혁, 양희중, 전치혁, "Event Tree 로 부터 상호연관도로의 변환시스템 ", 전산활용연구, 5, 1, 71-87, 1992.

  • 전치혁, "시뮬레이션에서 Total Hazard 를 이용한 신뢰도 추정", 한국경영과학회지, 16, 1, 59-67, 1991.

  • 전치혁, "A Comparison of Software Reliability Models", 대한산업공학회지, 15, 2, 65-75, 1989.