This version features:
Version 2.1 of the 1996 stock
An accurate recreation of the traditional signalling in use at the time
Fully functional Train Management System (TMS) – the only one of it’s kind in BVE (that we know of)
Also includes 2 playable passenger services – start at either Stratford or North Greenwich
Empty stock run starting at Charing Cross including an early prototype of following a preceeding service
Set in late 1999 just after the full opening of the Jubilee line extension. While in real life a full service was now running to Stanmore, our version runs from Stratford to West Hampstead due to time constraints on development. Westminster was not ready for opening when the extension was opened, and we have recreated this faithfully. The distinctive architecture of this line has been lovingly modelled and includes the iconic platform edge doors (PEDs)
Updated in Phase 3 release:
Working in-cab CCTV
Animated Traction Brake Controller (TBC)
Upgraded announcments utalising new BVE sound features
Improved TMS navigation
New features added to TMS
Working air conditioning within the cab
Improved carriage ambient noise also using BVE’s new sound features
Authentic door interlocking as found on the real train
Updated cab lighting including reflections
Downloads
Please follow the instructions carefully when installing this.
Ensure you have the latest version of OpenBVE installed before downloading this.
Before driving the train please read the driving guide. This train has been designed to be driven like the real thing, so it is important to familiarise yourselves with how to drive in each mode.
download the route