Clintonville bath facelift
This master bath in an older clintonville home needed brought back to life. It is a rental unit but bandaids were not an option. The ceiling (plaster) was removed, as well as the bath walls (for an enclosure). The ceiling area, and walls were filled with new insulation. The sink and toilet were re-used. The tub was refinished, and new plumbing (Valve, drain and overflow, supply lines) was put in. New porcelain tile floor too. This one took two weeks from start to finish.
Before and after photos!