BE - RF OPTIMIZATION DIVISION

BE Bradford Enterprises LLC has an experienced staff. We are able to detect sine wave activity and give a potential client a dynamic view of a Smith Chart. This engineering devise maybe used to set sweep testing markers and to determine sine wave activity. The owner created a wiring diagram, for the first Ericcsons Hi-Cap golden gate bridge cell site project, providing turnkey assistance. An important measure of cost control depends upon the validating of expenditures. Further, these actions, relate to the response of bills associated with the acquisition team and cost control. This entity specializes in project management and consulting.

Wireless Infrastructure Design

We provide technical support in the selection of a location that offers the best possible combination of lease terms, ease of permitting, and rapid construction through the preparation of feasibility studies and land use permitting documents. We put in the work so you can provide a worry-free service to your customer.

When challenged with projects that face stringent zoning and building requirements, our knowledge of multiple wireless equipment technologies and operational parameters allows us to create cost effective solutions that receive jurisdictional approval without compromising budgetary, scheduling, or operational criteria. Bradford Enterprises LLC has to date contributed to the construction of wireless sites that include:

  • Cellular and PCS services

  • CDMA technology

  • GSM technology

  • TDMA technology

  • ESMR technology

  • Raw land towers and monopoles

  • Stealthy antenna facilities

  • Tenant improvement sites

  • Switching centers

  • EIRP Effective Isotropic Radiated Power

  • Drive testing

  • Fiber Optics

Today the wireless industry is deploying new digital based technologies and services. Expanding both coverage and capacity in a competitive real estate market and an increasingly regulatory environment. A prelude to a fully optimized network. The introduction of active antenna systems on 5G base stations requires engineers to install and maintain them. Effective Isotropic Radiated Power (EIRP) for transmitter power and beam verification, is an alternative measurement method. We are mindful of its practical use. Azimuth alignments and LNA down tilt adjustments require an advance skill set we possess. Bradford Enterprises LLC embraces technology that improves an entities infrastructure. We work towards your success.