Structural Designer, Gray & Fick Ltd., London, ON, Jan. 2, 2019 - Present
- Analyze structures for small, single storey residential to large, 10+ storey residential projects using ETABS, SAFE, RISA3D, and RISA Floor
- Design and size steel, concrete, and timber components, including beams, columns, walls, and floor slabs
Engineering Co-op Student, Blackwell Engineering, Waterloo, ON, Sept. 14, 2015 – Dec. 18, 2015
- Used commercial software and hand calculations to design steel beams, joists, columns, and frames and concrete slabs and beams according to CSA standards
- Completed structural site instructions to modify or clarify existing works and to resolve issues arising from site conditions in large scale condominium development project
- Reviewed shop drawings for accuracy of reinforcing bars, concrete walls and columns, and wood and steel framing
Engineering Co-op Student, Blackwell Engineering, Toronto, ON, Jan. 5, 2015 – May 1, 2015
- Used ETABS, SODA, WoodWorks, and hand calculations to design steel and timber beams, joists, and columns according to CSA standards
- Drafted structural plans, elevations, and details using AutoCAD and Revit
- Conducted preliminary static and dynamic analysis of proposed pedestrian corridor
Engineering Assistant, Ministry of Transportation, St. Catharines, ON, May 5, 2014 – Aug. 22, 2014
- Analyzed a precast box beam girder bridge using S-FRAME and Microsoft Excel
- Assisted in setting up and running a performance load test, including directing test trucks
Engineering Assistant, City of Ottawa, Ottawa, ON, Sept. 9, 2013 – Dec. 20, 2013
- Used the Ontario Structural Inspection Manual and internal forms to inspect and bridges
- Designed a small culvert crossing, including analyzing catchment areas and hydraulic conditions
Engineering Technician, Regional Municipality of Niagara, Thorold, ON, Jan. 7, 2013 – Apr. 26, 2013
- Planned traffic intersections using Regional Municipality of Niagara and Ministry of Transportation design standards
Engineering Assistant, McCormick Rankin Corp., Mississauga, ON, Apr. 30, 2012 – Aug. 24, 2012
- Completed quantity calculations for various items including concrete removals, concrete quantities, steel reinforcing bar quantities, earth excavation, and earthen backfill
- Inspected various bridge and culvert structures using visual methods and sounding; inspected for delaminations, spalls, and other potential structural problems