Detailed design for Gia Lam water supply with capacity of 30,000 m3/day
To design the processing line treatment of iron, manganese, ammonia from the water
2002-2003: Preparation of feasibility study on upgrading the capacity of Gia Lam Water Supply Plant from 30,000 m3 /day to 60.000 m3/day and expanding clean water transmission and distribution pipeline net work.
Supervisor for construction works in 2011.
Cooperated with SOIL&WATER (Finland), preparation of technical report, survey, improvement design and increase the capacity of Hanoi water supply system, construction of water plants Nam Du and Cao Dinh
2000: Cooperation with NIPPON KOEI CO. LTD. (Japan) to provide consulting services for basic design and detailed design for water supply system and waste water treatment plant.
2002: Construction design of WTP and WWTP under the contract with EBARA- TAISEI to project implementation.
In 2008-2010, providing consulting services for supervisor of wells water intake
2010: Provides service for feasibility study and detailed design.
2011: Detailed design.
2011-2012: Preparation of feasibility study project, basic design.
2011: Preparation of feasibility study project and detailed design.
Cooperated with SOIL&WATER (Finland) in survey, design and cooperated with CES Consulting Engineers (German) in construction supervision to improve and upgrade water supply , construction An Duong WTP with capacity 120,000 m/day, raw water pipeline and distribution pipeline.
Cooperated with SOIL&WATER (Finland) in preparation feasibility study, design, construction supervision for Sanitation and drainage project in Hai Phong
Preparing feasibility study for Sai Gon water supply system project, the capacity in the 1st stage is 300,000 m3/day.
Designing, construction supervision pumping station and raw water pipeline 1500mm.
Design of water reservoir, pumping station II and facilities of plant.
2011: Adjust the feasibility study of Saigon water supply project in the 1st stage. Readjust the detailed design and the total cost estimate of this project.
Preparing pre - feasibility study for extension of transmission and distribution network throughout the city.
Designing, preparation of tender document for procurement of material and construction of transmission and distribution network grade I 400mm - 1500mm in Binh Thai-Binh Loi, district 10 and Thu Duc .
Investigation, preparation of feasibility study for 51km water transmission pipeline, across - river pipeline, booster pumping station, distribution network.
Cooperation with PACIFIC CONSULTANTS INTERNATIONAL (Japan) to provide consulting services for environmental improvement project in Doi-Te channel, Ho Chi Minh city in the phase 2001-2005: preparing the feasibility study and technical design.
Continue to work with PACIFIC CONSULTANTS INTERNATIONAL (Japan) review the technical design, construction supervision for this project.
Preparation of feasibility study and detailed design for Ba Ria- Vung Tau underground water treatment plant, capacity 20,000 m3/day.
Design the Extension and improving of Dinh river water supply plant, capacity 30,000 m3/day.
Preparation of feasibility study for the construction Da Den water supply system, capacity 100,000 m3/day
Cooperated with NIPPON KOEI CO. LTD. (Japan) to carry out investigation, design and prepare tender document, and construction supervision for the Da Den Dam water supply system with capacity of 50,000m3/d in stage I.
Cooperation with SAFEGE, BERIM (France) to carry out consulting service, Detailed design and construction management for the wastewater transmission network, wastewater treatments, capacity of 22,000 m3/d and 7 booster pumping stations. Supervisor for construction works of WWTP in 2010.
Preparation of construction investment project and basic design.
Survey, preparation of construction investment project, construction design and preparation of construction project.
Year 2009-2011: Preparation of construction investment project, survey and construction design for this project, capacity of 100,000m3/d
Preparation of Feasibility Study.
Preparation of Feasibility Study, detailed design, bidding document, cooperation with SNC-LAVALIN (Canada) for drainage, waste water treatment and supply water into 2015 period.
Preparation of Feasibility Study, detailed design, bidding document, cooperation with CDM (USA) 2010 – 2011.
Preparation of T/A report for waste water treatment plants, period to year 2020, cooperation with Carlbro A/S (Australia).
Cooperation with NIPPON KOEI CO. LTD. (Japan) to provide consulting services for investigation, design, tender document, construction management for 100,000m3/d water treatment plant, Bien Hoa - Nhon Trach transmission and distribution pipeline, period of 2000-2006.
Preparation of feasibility study to construct Drainage and sewerage system and wastewater treatment, capacity of 25,000m3/d - 50,000m3/d.
Investigation, designation of 82.500m3/d Quang Te II WTP Extension and 60.000 m3/d Quang Te III WTP Construction Project, 2009
Preparation of feasibility study for Medium Cities Development Project ( MCDP ) funded by WB. Phu Ly city sub-project.
Detaied design highway D4-N7 stage 1 with section of 68 m.
Cooperated with POYRY (Finland) to provide consulting services for investigation, basic design, technical training and bidding document for 50 towns, 2008-2009.
To provide consulting services for investigation, basic design, technical training and bidding document for 64 communes.
Supervisor for construction works of water supply systems in 2010 – 2011 in Thai Binh project
Cooperation with NIS company( Japan) provide consulting services for survey, design and construction supervision in Rach Gia(Kien Giang), Phan Rang- Thap Cham(Ninh Thuan), La-Hai and Chi Thach (Phu Yen).
Cooperated with BLACK&VEATCH (USA) to provide consulting services for investigation, basic design, technical training and bidding documents to 4 provinces: Ha Nam, Thai Binh, Nam Dinh, Binh Dinh.
Preparation of feasibility study and detailed design for Lang Son Water Supply System - Stage I and II.
Preparation of feasibility study, Vietnam funded.
Preparation of feasibility study
Year 2007: Detailed design.
Investigation, preparation of feasibility study.
Survey, preparation of feasibility study for this project, stage I: 120,000 m3/ day.
Detailed design and construction supervision.
Cooperated with BLACK&VEATCH (USA) to update feasibility study, design for drainage system, waste water treatment plant for 2 provinces: Thanh Hoa, Ha Tinh stage 2006 – 2008.
Year 2004: Feasibility study and detailed design.
Survey, providing consultancy service of feasibility study and detailed design
Year 2006: Investigation, feasibility study and detailed design.
Topographic survey, preparation feasibility study of the projects, detailed design and total cost estimation.
Topographic survey, preparation of investment projects, construction design
OCI has involved in providing consulting services for investigation, design, procurement of material and equipment for investment projects and rural water supply and sanitation projects, such as:
- Water supply project in 6 mountainous districts of Nghe An province.
- Water supply for residential Long Dat district, Ba Ria- Vung Tau province
- Rural water supply system in Lao Cai province (The poverty reduction program 135- Ministry of construction)
- Rural water supply project in suburb of Ha Noi
We has provided planning services such as:
- Lang Son water supply planning project
- Vinh Phuc water supply planning project
- Coastal cities Environment Sanitation Project in central Vietnam, Nha Trang city sub-Project, Khanh Hoa province. WB funded (2011-2013). Cooperation with CES (Germany)
- Vung Tau city Waste water collection and treatment project. Cooperated with Safege and Berim (France) 2009 – 2011.
- Coastal cities Environment Sanitation Project in central Vietnam, Quy Nhon city sub-Project, Binh Dinh province. WB funded (2007-2008). Cooperation with POYRY(Finland)
- Drainage and Environment Improvement Project in Hanoi City - Stage I, JICA funded. Cooperation with NIPPON KOEI CO. LTD. (Japan) 2007 – 2009.
- Ho Chi Minh city Water Environment Improvement project, JICA funded. Cooperated with PCI (Japan)
- Da Den dam water supply system, capacity of 100,000 m3/day, Ba Ria- Vung Tau province, stage 2006-2007
- Halong City and Campha Town Sanitation Project - stage 1B, WB funded. Cooperated with Kampsax A/S (Denmark)
- Haiphong Water Supply Project - stage 1A, WB funded. Cooperated with SOIL&WATER (Finland)
- Da Nang Priority Infrastructure Investment project- stage 1B (2000-2004). WB funded. Cooperation with DHV (Finland)
- North Thang Long- Van Tri water supply project, Ha noi city, stage II, 8 additionalwellsin theRed River bank(2009-2010)
- Upgrading the capacity of the Gia Lam water supply plant to 60,000 m3/day, stage II. (2010-2011)
- Water supply project in Red river delta provinces, WB funded. Construction supervision the water supply system in Hai Duong Province (2012).
- Water supply project in 6 provinces Thai Nguyen, Son La, Quang Nam, Dong Thap, Lam Dong, Vinh Long (WB funded), cooperation with Fichtner ( Germany), 2012-2013
In addition to consulting services, scientific research, and technology transfer, we have carried out technology transfer, construction of medium and small-scale water supply and sewerage works, supply and production of specialized materials for water supply and sewerage works.
Upgrading capacity of Ham Rong Water supply up to 20,000 m3/day as EPC. Thanh Hoa Province.
Construction of Water Supply System in Muong Khuong town, Lao Cai province
Construction and applying new technology for Water Purification Treatment Plants for Dinh Cong and Linh Dam new town areas, Hanoi city.
Manufacture and procurement of high-loading aeration equipment for Water Treatment Plant, such as Bac Kan, Ha Dinh, (Hanoi), Bac Ninh, Ba Ria-Vung Tau ...
Procurement of material and equipment for numerous water treatment plants.
Production of water treatment and aeration facilities.
Procurement of equipment, construction of rural water treatment stations over whole country.