After completing this chapter you should know how to ......
define a directed graph?
define flow?
calculate the maximum flow through a network?
draw and use a bipartite graph to solve allocation problems?
find the optimal allocation of multiple groups of objects?
identify predecessors of an activity?
draw an activity network and use it to plan for a project?
account for float times in our project?
find the earliest starting time and latest finishing time for an
activity in a project?
identify the critical path of an activity network?
Please complete the following Edrolo Revision Tests
Revision Test 1
https://edrolo.com.au/s/2810506/
Revision Test 2
Lesson 1 - Flow Problems
Learning Intentions
To be able to….
define and describe flow.
calculate the maximum flow through a flow network by observation.
identify cuts and calculate cut capacities.
determine the maximum flow through a flow network by finding the
capacity of the minimum cut.
solve flow problems by finding minimum cut capacities.
Tasks
Complete the worked solutions to the notes on Ex 14a and then work on Ex 14a
Homework
Complete Ex 14a
Edrolo Link
Lesson 2 - Matching and Allocation Problems (Ex 14b)
Learning Intentions
To be able to….
define and describe bipartite graphs.
olve assignment problems using the Hungarian Algorithm.
Tasks
Complete the worked solutions to the notes on Ex 14b
Homework
Complete Ex 14b
Edrolo Link
Lesson 3 - Precedence Tables and Activity Networks (Ex 14c)
Learning Intentions
To be able to….
define and describe bipartite graphs.
solve assignment problems using the Hungarian Algorithm.
Tasks
Complete the worked solutions to the notes on Ex 14c
Homework
Complete Ex 14c
Lesson 4 - Scheduling Problems (Ex 14d)
Learning Intentions
To be able to….
understand activity networks that include weights (durations) of each
activity.
determine the EST for activities using forward scanning.
determine the LST for activities using backward scanning.
calculate and understand the existence of float times for some activities.
identify the critical path and completion time of a project.
Tasks
Complete the worked solutions to the notes on Ex 14d and complete Ex 14d
Homework
Complete Ex 14d
Lesson 5 - Crashing (Ex 14e)
Learning Intentions
To be able to….
use crashing to reduce the completion time of a project.
minimise the cost of crashing activities to achieve the maximum
reduction in completion time of a project.
Tasks
Complete the worked solutions to the notes of Ex 14e and complete Ex 14e
Homework
Ex 14e