The new generator housing was manufactured for a utility company in our workshop using measurements taken on site and then installed by our team with minimal disruption. Due to the proximity of residential buildings, the noise emission of this enclosure had to be whisper-quiet.
We are able to manufacture a whole range of enclosures to suit any environment.
New galley was fabricated off site ready for install .
Removal of old galley and installation works were carried out during an over night shut down of kitchen to allow for minimal disruption.
Railings and gates were fabricated and a paint finish applied off site following customer requirements this allowed for minimal disruption during removal of old railings and gate and the installation of new.
This bulkhead screen system is installed directly over the flow path of an existing storm drain to collect all debris and prevent them from entering the water course, helping to protect wildlife and preserve the environment. Solids are retained in a smooth, easily interchangeable collection bag when full. The modular design can be adapted to most existing applications.
A robust solution to overcome a difficult access, egress was required . We carried out a site visit to measure prior to the manufacturing of access platform and ladders with a galvanized finish .
An example of a custom tank cover caping fabrication installed on-site at a water treatment facility .This was essential to prevent further deterioration of the concrete structure, which caused the rotating bridge to become unstable, leading to premature failure of the asset.
A Bespoke Chequer Plate Cover fabricated and installed on site. The requirements from the client were to allow for access to existing valving arrangements whilst covering a deep chamber for safety.
An access walkway and platform with handrailing was required for an aggregates company over a man made lake. This was fabricated in our workshop, galvinised and then taken to site for installation by our engineers.
All components were manufactured to client supplied specification and drawings while following EN: 1090 standards.
One of many examples of custom air compressor acoustic enclosures that were manufactured and installed by SDR Fabrications to meet a client's exacting specifications. It needed to have the ability to suppress noise output while meeting the cooling requirements of equipment operating at high temperatures.
New handrailing and ramp with a non slip flooring were fitted to create a new disabled access to the building and a new white paint finish was applied to handrailing. All as specified by customer.
Private client requested a bespoke fence . After discussion with customer we were able to fabricate, apply finish and install fence posts and panels.
First photo shows metal work before paint. finish applied.
In total 7 panels were fabricated and fitted.
Bespoke Gate and Two fixed panels
Private client requested bespoke gates with fixed side panels., this was to follow on from the new metal fence panels previously supplied by us.
Corby - Tank Pipe Work Repair
After the removal of old temporary welded patch on an oil tank a new permanent patch was fitted and painted to customer specification .
The job was then MPI (Magnetic particle inspection) tested by an external supplier .
Pontefract - Petroleum Pipework
Welding and Installation of new external pipework to a bunded storage tank situated across a loading bay this was then connected to the loading skid.