Overcrowding at Washington
Overcrowding is a high priority issue at Washington. The facility - built 50 years ago - was not constructed to serve its current population of over 320 students. The pictures and videos below show students navigating the hallways and stairwells during passing periods.
Washington Stairwell During Passing Period
Washington Stairwell During Passing Period
Returning from Basement Instruction
Returning from Basement Instruction
Video of Hallway During Passing Period
Video of Hallway During Passing Period