Before it started 10-22-18


Materials being delivered 10/18/18 for field project

Tree work is underway 10-22-18

Demolition has started 10-22-18

Tree removal finalized and site work started 10-29-18

10-29-18 Drainage culvert install

11-5-18 things are moving along nicely

Caito Field 11-6-18. I had to do 2 days in a row with the changes happening so fast.

11-14-18 Another great week even with the bad weather. This is prep for retaining wall.

The field is coming along. This weather is not helping us. Here is a photo from 11-21-18

Even in the rain the work must continue. Progress is happening. 11-26-18


Caito goes on, It's going well. 11-29-18

Look at the elevation drop between the 2 fields

12-4-18 it is cold but R.A.D Sports keeps push through to get us a new field.

Caito is coming a long very well. 1-3-18

Things are still going well. We are in the new year and work continues on.

This is a much better view of the retaining wall. 1-9-19

Work continues even when it is cold. 1-14-19

1-29-19 The snow and ice are gone and they are back at it. Very nice to see.

The cold is gone and the work is back on. 2-4-19


Even working in the snow


2-25-19 the work continues on. Still on schedule and working through the weather events each week.

The snow has put a damper on work. Once the cold goes they will be back.

The retaining wall is continuing on even though we had the snow. R.A.D has only missed a couple of days throughout all of the weather we have had. They are also clearing the septic tanks from the original system.

Retaining walls almost complete. 3-18-19 things are moving along

Caito field moves forward. This nice weather is making a big difference.

4-1-19 All is moving. Work continues and field takes shape.


The field is moving along and looking good 4-8-19

Field is really taking shape now. 4-22-19

Caito Field 4-29-19 Big things happening. It is really looking like a field now. Fine grading going on and all this rain is not helping us.

Caito field 5-6-19 Things are still moving. The rain is not helping. For every day of rain is a loss of a day on the project.

Caito Field. 5-13-19 Things are really coming together now. The padding was delivered today and is ready for the install. We need this weather to change. The rain is causing delays.

The field is really taking shape. Padding and Turf are onsite. Track going in this week then the field will go in. 30 Days after the track the surface and lines will go on.

5-28-19 Padding is complete and turf rolls are in place. Awaiting the paving contractor to start track. Things are coming together.

Track paving has begun and will be completed this week. 6-3-19

Track paving is complete. After 30 days of curing the track surface will be applied and lines will be painted. 6-10-19

Almost there. 6-17-19 Finishes are being completed around field and almost ready to spread sand and rubber into the turf.

Coming together nicely. Field is almost completed.

7-1-19 All that is left is the track surface. Things are looking so nice.

Track surfacing company is onsite and things are getting started. 7-16-19

Caito field 7-22-19 the prep for the surface is done and the surface will start going down.

The track surface is almost done, next they will put multiple color coats and then add the lines.

7-30-19 Track surface is in and lines will be completed next.

Caito field. Completed other than punch list items. 8-13-19