The project is based on being able to transport drinking water through water pumping systems, they will be in charge of submitting surface or underground water, be it from a river, lake, sea or some other type of water body, to different processes this in order to guarantee that it can be suitable for the consumption and use that the person exercises in their day to day, being this a safe and easy way, without any difficulty for people in rural homes since they are the least They have this type of resources and that it can be distributed by a large part of the population in order to satisfy the consumption needs of the population.
Design a control and power circuit for the installation of motors in pumping systems that transfers drinking water through pipes to surrounding areas.
• Identify affected areas where there is not the best accessibility to drinking water.
• Locate the drinking water pumping system in a place accessible by the population for easier transfer to their homes.
• Inspect the use of drinking water in a certain time to obtain a description of the consumption of drinking water made by the population.
As there is no type of drinking water system, this generates various problems such as: poor quality of life for people and at the same time causes poor use of vital fluid.
The population of the communities move to the source of supply to obtain the vital liquid and then move back to their homes.
Another problem is the quality or the potability of the vital liquid since most communities do not have the resources and that causes the quality of the vital liquid to be almost nil.
Thus, the proposal for a drinking water pumping system is presented to provide a solution to the problems
After a thorough investigation of a problem that a certain area of the population has, both the lack of water supply and the need for automation when supplying it. This process is one of the most important since the area of the population most affected by this event has to be found and, in addition, to be able to adapt to the conditions in which they inhabit since not all people will have the same economic possibilities.
In order to make the investigation of these aforementioned cases easier and faster, it is necessary to distribute different areas to the members of the team that will carry out the project and prioritize rural areas since there are more cases of the lack of This substance, some people in rural areas have to travel long roads to be able to have a little of it and for this reason this area has to be taken as a priority.
After having carried out one of the most important steps, such as research, you have to know the budget you have to be able to carry out this project since the type of cistern that will be used will depend on this, the more budget you have, the bigger it will be. the pumping station and therefore better water spreading in people's homes.
You have to know a little more about the subject and this can be with the help of an expert who handles the subject more to guide you on the pros and cons of doing a project as important as the water pumping stations. potable.
With this work it is concluded that to carry out the potable water supply project in rural areas, several aspects must be considered to carry it out.
1. Identify which are the rural areas that do not have this service.
2. Verify that the potable water service reaches the affected areas in its entirety.
3. The supply source must be within reach of all the inhabitants.
4. All the inhabitants of rural areas must make good use of the vital liquid.
5. Inform the inhabitants of said area when said project will begin.