2023 Shadow Diagrams in support of Council DA Applications:
24 Norma Rd, Palm Beach for Justin Long Design
183 Flood St, Leichhardt for F & F Constructions
***************
2022 Shadow Diagrams in support of Council DA Applications and Objections:
99 Military Rd, Dover Heights for Justin Long Design
Elanora St, Coomba Park for Efficio Projects
***************
2021 Shadow Diagrams in support of Council DA Applications and Objections:
St. Giles Ave, Greenwich for Vernon Architects
74 Dudley St, Coogee for GAT & Ass.
83 Victoria Rd, Bellevue Hill for Michael J. Suttie Architects
41 Gurney Cr, Seaforth for Bill Tulloch BSc (Arch) BArch (Hons) UNSW PCPPA RIBA RAIA
21A Hopetoun Ave, Mosman for Maddocks Solicitors
20 Glover St, Lilyfield Overshadowing and reduced solar access
1 Walsh St, Narrabeen Overshadowing and reduced solar access
Macleay St, Ryde for F & F Constructions
Shadow Diagram Accuracy Tests:
20 Glover St, Lilyfield:
Vertical shadow diagram of North Elevation (detailing 7 windows) showing extent of existing shadow at 9:15am on 21/04/2021 was compared and measured on site with actual shadows and found to be exact. Survey information of 5 windows was provided on Geosurv Survey No:191142, dated 29/11/2019. Heights of a further 2 windows were measured on site by owner under RAW direction.
27 Kulgoa Rd, Bellevue Hill:
Our shadow diagrams were physically tested (measured) by Woollahra Council Town planners on 21/6/2005 at 3pm. (Winter Solstice). Our vertical and plan shadow diagrams were compared with actual shadows on a neighbouring site where survey information was unavailable. RAW had taken their own measurements and levels.
On measuring location and extent of shadows on site, Woollahra Council Town planners found our diagrams of existing shadows cast were within 10mm of actual shadows.
73 Prince Alfred Pde, Newport:
Vertical shadow diagram of East Elevation window showing extent of existing shadow at 9:15am on 5/09/2006 was compared and measured on site with actual shadows and found to be with 8mm. Survey information of building and window was provided by DP Surveying Services, Survey No:203, dated 18/7/2006.