Search this site
Embedded Files
Skip to main content
Skip to navigation
BS Fisheries-Main
Home
Guide to the Site
Document Access
As Flipbooks
As Google Drive Files
Program Documents
BS Fisheries Accreditation Task Force
————————
Return to Main Site ↩
BS Fisheries-Main
Parameter A
Campus
Implementation
Benchmark Statements
I.1. The site infrastructure development plan is implemented as planned.
I.2. The site plan is strategically displayed inside the campus indicating the location of the different buildings, driveways, parking areas, etc.
I.3. The infrastructure development plan is implemented in accordance with approved zoning ordinances.
I.4. Covered walks are provided to protect the academic community from inclement weather.
I.5. The Institution implements a Waste Management Program.
I.6. The Maintenance Unit or its equivalent periodically inspects school facilities and equipment to ensure their proper utilization and upkeep.
I
.1.
The site infrastructure development plan is implemented as planned.
BSFI-Area-8-A-I.1.pdf
I
.2.
The site plan is strategically displayed inside the campus indicating the location of the different buildings, driveways, parking areas, etc.
BSFI-Area-8-A-I.2.pdf
I
.3.
The infrastructure development plan is implemented in accordance with approved zoning ordinances.
BSFI-Area-8-A-I.3.pdf
I
.4.
Covered walks are provided to protect the academic community from inclement weather.
BSFI-Area-8-A-I.4.pdf
I
.5.
The Institution implements a Waste Management Program.
BSFI-Area-8-A-I.5.pdf
I
.6.
The Maintenance Unit or its equivalent periodically inspects school facilities and equipment to ensure their proper utilization and upkeep.
BSFI-Area-8-A-I.6.pdf
Report abuse
Page details
Page updated
Report abuse