Systems Engineering and Integration - Gerhardt
Plasma Facing Components - Loesser
PFC Tile Attachment Modifications to the Barrel Nut Peer Review Dashboard
PFC OBD Transition Plate and Interface Tile Modification FDR Dashboard
Vacuum Vessel and Internal Hardware - Loesser
HTT/HTP Vessel Side Water & He Connection Line FDR Dashboard
Passive Plate Tile Preload & Grafoil Compression Peer Review Dashboard
In Vessel Shutter Material Modification Peer Review Dashboard
PF1A Sling Bottom Plate & Belt PSA Material Peer Review Dashboard
Lateral Support Shim Modification/Casing Sensor Instrumentation PR Dashboard
Upper Primary Passive Plate Bracket Drilled Holes Solution PR Dashboard
PF4/5 Coil Realignment Metrology Fiducialization Peer Review Dashboard
Passive Plate Helium Tube Support Bracket Weld Modification Peer Review Dashboard
Passive Plate Helium Tube Bracket Mounting Plate Modification Peer Review Dashboard
PF1A Coil Sling Belt and Belt Buckle Modification Peer Review Dashboard
Upper Bay L Helium Tube Bracket Installation Peer Review Dashboard
PF1A-1B Sling Bottom Modification & Sling Assemblies Peer Review Dashboard
Center Stack Casing Assembly Bellow Weld Modification Peer Review Dashboard
Passive Plate In-Vessel Weld Modification Peer Review Dashboard
Passive Plate In-Vessel Weld #6 Modification Peer Review Dashboard
MCS Upper Hanger Region Sling Ear and Capture Flange Interface Peer Review Dashboard
Upper Hanger Region PF1A Sling Ear & Capture Flange Interface Peer Review Dashboard
Passive Plate Bay B Bracket Installation - He Tube Move Peer Review Dashboard
Secondary Passive Plate Drilled Holes, Shunt Redesign, Global Model Analysis Peer Review Dashboard
Inner PF Coil Sling Diving Board Modification Peer Review Dashboard
Microtherm Mechanical Support Final Peer Review for the Center Stack Casing Assembly
Vacuum Vessel Global Coordinate System Peer Review Dashboard
Center Stack Casing Assembly Interface Modification Peer Review Dashboard
Primary Passive Plate Assembly Trial Fit Solution Peer Review Dashboard
Primary and Secondary Passive Plate Assembly Trial Fit Interface Solutions Peer Review
Temporarty Installation of the CS Casing and PF-1 Coil Assemblies Peer Review Dashboard
PF1 Prototype and Manufacturing Review Dashboard
Inner PF Coil Preliminary Design Review Dashboard
Turn-to-Turn Testing Peer Review Dashboard
Outer PF Coil Inspection / Repair PDR Dashboard
Inner PF Water Fitting Peer Review Dashboard
TF Bundle Stage 1 Review Dashboard
TF Bundle and CS Assembly Alignment Final Design Review Dashboard
Inner PF Coil Full Power Test Readiness Peer Review Dashboard
Vacuum Vessel Grounding Connection Final Design Review Dashboard
PF-4 Radial Pin Weld Attachment Modification Peer Review Dashboard
PF1CL BUS Bar Clamp Support Modification Peer Review Dashboard
Reduced Insulation Resistance TF/OH Bundle Peer Review Dashboard
Remove OH Coil from the NSTX-U TF/OH Magnet Bundle Dashboard
Phase I Prototyping Test for the New TF/OH Bundle Peer Review Dashboard
Resin Restoration on Either Side of the Legacy TF Bundle Flags FDR Dashboard
PF1C Upper Electrical Isolation Hardware Modifications Peer Review Dashboard
TF/OH Bundle Gap PTFE Material Rubbing Fatigue Test Peer Review
TH-OH Bundle Inner G11 Tube Vacuum Pressure Impregnation Connection Peer Review
Bundle Insulation Fiberglass Strength Requirements Peer Review Dashboard
TF Conductor Friction Stir Welding (FSW) Undercut Peer Review Dashboard
Bundle Insulation Fiberglass Strength Requirements Peer Review Dashboard
TF/OH Bundle Shipping Container Final Design Review Dashboard
Change to the the Design of the OH Coax Housing Peer Review Dashboard
Peer Review of Wet Layup as Inner Layer of the OH Solenoid Ground Wrap