20210928 NSTX-U Director's Review
Home
Agenda
Review Information
Committee
Remote Connection Information
Management - Private
Machine Core - Public
Plenary - Public
Balance of Plant - Public
Cost and Schedule - Public
ES&H Public
ES&H - Private
Plenary - Private
Machine Core - Private
Balance of Plant - Private
Cost and Schedule - Private
Management - Public
Charge
Points of Contact
Q&A
Presentations
Management
ES&H and WPC
PPPL Safety Manual
Cost and Schedule
ASO
20210928 NSTX-U Director's Review
Home
Agenda
Review Information
Committee
Remote Connection Information
Management - Private
Machine Core - Public
Plenary - Public
Balance of Plant - Public
Cost and Schedule - Public
ES&H Public
ES&H - Private
Plenary - Private
Machine Core - Private
Balance of Plant - Private
Cost and Schedule - Private
Management - Public
Charge
Points of Contact
Q&A
Presentations
Management
ES&H and WPC
PPPL Safety Manual
Cost and Schedule
ASO
More
Home
Agenda
Review Information
Committee
Remote Connection Information
Management - Private
Machine Core - Public
Plenary - Public
Balance of Plant - Public
Cost and Schedule - Public
ES&H Public
ES&H - Private
Plenary - Private
Machine Core - Private
Balance of Plant - Private
Cost and Schedule - Private
Management - Public
Charge
Points of Contact
Q&A
Presentations
Management
ES&H and WPC
PPPL Safety Manual
Cost and Schedule
ASO
NSTX-U Director's Review
Presentations
Plenary Presentations - AM
Project Overview (Galayda)
Updated 9/28/21
DR_Overview_Galayda_r02c.pptx.pdf
Project Manager Overview (Hill)
Updated 9/28/21
9_23_21 DR_ Baseline Revision_9_28_21.pdf
Evolution of TPC
(added 9/28/21)
Roadmap - Roadmap Master_9_28_21.pdf
Technical Overview (Gerhardt)
Updated 9/28/21
DR_TechnicalOverview_Gerhardt_9_28_21.pdf
ES&H Overview (ISM, COVID-19) (Sheneman)
Updated 9/23/21
DR_ES&H_Sheneman_9_23_21.pdf
APM #1 Overview (Swider)
Updated 9/
2
5/21
DR_Overview_APM1_Swider_9_25_21.pdf
APM #2 Overview (Gattoni)
Updated 9/25/21
DR_Overview_APM2_Gattoni_9_25_21.pdf
APM #3 Overview (Jernigan)
Updated 9/25/21
DR_Overview_APM3_Jernigan_9_25_21.pdf
APM #4 Overview (Stevenson)
Updated 9/25/21
DR_Overview_APM4_Stevenson_9_25_21.pdf
Presentations
- Machine Core
Machine Core Structures: WBS 1.01.02.01
Cog: D. Loesser, APM:
G. Swider
(Updated 9/27/21)
DR_Loesser_Machine_Core_Structures_9_27_21.pdf
Bus Work: WBS 1.01.03.02
Cog: D. Cai, APM:
G. Swider
(Updated 9/27/21)
DR_Cai_Buswork_9_25_21.pdf
CS Casing: WBS 1.01.02.06
Cog: M. Kalish APM:
G. Swider
(Updated 9/25/21)
DR_Viola_CS_Casing_9_25_21.pdf
PF-4/5 Realignment: WBS 1.01.02.08
Cog: C. Pagano, APM:
W. Gattoni
(Updated 9/25/21)
DR_Pagano_PF45Move_9_25_21.pdf
Vacuum Vessel Field Scope: WBS 1.01.02.03
Cog: M. Safabakhsh APM:
G. Swider
(Updated 9/25/21)
DR_Safabakhsh_VVIHFieldScope_9_25_21.pdf
Passive Plates: WBS 1.01.02.02
Cog: A. Jariwala, APM:
W. Gattoni
(Updated 9/25/21)
DR_Jariwala_Passive_Plates_9_25_21.pdf
Magnet Field Scope (TF Bundle): WBS 1.01.03.04
Cog: M. Kalish, APM:
L. Hill
(Updated 9/29/21)
DR_MagnetFieldScope_TFBundle_9_29_21.pdf
Plasma Facing Components (PFCs): WBS 1.01.01
Cog: J. Klabacha, APM:
W. Gattoni
(Updated 9/25/21)
DR_Klabacha_PFCs_9_25_21.pdf
PFC Diagnostics: WBS 1.04.01.02
Cog: B. Stratton, APM:
W. Gattoni
(Updated 9/28/21)
DR_Stratton_PFC_Diagnostics_9_28_21.pdf
Presentations- Balance of Plant
PF-1B Power Loop + PSS Breakers: WBS 1.09.04.03
Cog: J. Dellas, APM:
T. Jernigan
(Updated 9/28/21)
DR_Dellas_PF-1b And Breakers_9_28_21.pdf
Fission Chamber Neutron Detectors: WBS 1.04.01.08
Cog: B. Stratton, APM:
T. Jernigan
(Updated 9/25/21)
DR_Stratton_Neutrons_9_25_21.pdf
Personnel Safety System: WBS 1.09.04.01
Cog: J. Petrella, APM:
T. Jernigan
(Updated 9/25/21)
DR_Petrella_PSS-SIS _9_25_21.pdf
Field Seal Repairs: WBS 1.04.01.05
Cog: T. Jernigan, APM:
T. Jernigan
(Updated 9/25/21)
DR_Jernigan_FieldSealRepairs_9_25_21 .pdf
Machine Instrumentation: WBS 1.04.01.01
Cog: G. Tchilinguirian, APM:
T. Jernigan
(Updated 9/28/21)
DR_Tchilinguirian_Instrumentation - FO_9_28_21.pdf
Presentations
- Reassembly, Commissioning and ASO
Commissioning: WBS 1.09.03.01
Cog: Stevenson, APM:
T. Stevenson
(Updated 1/25/21)
DR_Commissioning_Stevenson_9_25_21.pdf
Reassembly: WBS 1.09.02.01
Cog: S. Raftopoulos APM:
T. Jernigan
(Updated 1/25/210)
DR_Reassembly_Raftopoulos_9_25_21.pdf
ASO Implementation: WBS 1.09.01.01
Cog: Cropper, APM:
T. Stevenson
(Updated 1/27/21)
DR_ASOImplementation_Cropper_9_27_21.pdf
Presentations
-
ES&H, Management
Project Controls Overview (Langish)
Updated 9/28/21
RevBL_Cost_Schedule_Risk 09282021.pptx
Presentations-
Technical but not on Agenda due to small ETC
Shorted Turn Protection: WBS 1.10.01.01
Cog: G. Tchilinguirian, APM:
T. Jernigan
(Updated 9/21/21)
DR_Tchilinguirian_STP._9_21_21.pdf
Interspace Vacuum Pumping System: WBS 1.03.03.04
Cog: D. Cai, APM:
G. Swider
Updated 9/15/21)
DR_Cai_IVPS_9_15_21.pdf
Heat Transfer Plate and Tubing: WBS 1.01.02.04
Cog: D. Cai, APM:
G. Swider
(Updated 9/15/21)
DR_Cai _HTT_HTP_9_15_21.pdf
DC Power Supply: WBS 1.03.01.05
Cog: A. Falcon, APM:
T. Jernigan
(Updated 9/17/21)
DR_Falcon_DCSupplyReconfig_9_18_21..pdf
Medium Temperature Water System: WBS 1.03.01.02
Cog: J, Browning, APM:
T. Jernigan
(Updated 9/17/21)
DR_Browning_MTWS_9_18_21..pdf
Duct Shield and Vessel Blackening: WBS 1.04.01.03
Cog: W. Harris, APM:
W. Gattoni
(Updated 9/15/21)
DR_Harris_AerodagAlt_DuctShield_9_15_21.pdf
Private Flux Region Fueling: WBS 1.03.03.05
Cog: D. Cai, APM:
G. Swider
(Updated 9/11/21)
DR_Cai_PFR_9_15_21.pdf
Alarming ODH Monitors: WBS 1.08.01.02
Cog: M. Cropper, APM:
T. Jernigan
(Updated 9/17/21)
DR_Cropper_ODH_9_17_21.pdf
Inner-PF Coils: WBS 1.01.03.01
Cog: M. Kalish, APM:
G. Swider
(Updated 9/11/21)
DR_Kalish_Inner_PF_Replacement_9_15_21.pdf
Hot Helium System: WBS 1.03.01.01
Cog: D. Reneau, APM:
T. Jernigan
(Updated 9/17/21)
DR_Reneau_HTHS_9_18_21..pdf