Search this site
Embedded Files
Skip to main content
Skip to navigation
20200526 Recovery Project CDE-3B IPR
Home
Review Information
Points of Contact
Review Committee
Charge Questions
Agenda
Remote Connection
B-205 Zoom Information
Cost and Schedule Private Zoom
Machine Core Private Zoom
Director's Conference Room Zoom Information
ES&H/ASO/QA Private Zoom
B343 Zoom Information
Balance of Plant Private Zoom
Full Committee Private Zoom
B-252 Zoom Information
Management Private Zoom
B-318 Zoom Information
Presentations
PM, Cost, Schedule and Risk
Organization
Risk
Management Documents
Cost and Schedule
Previous Reviews, Recommendations, and Responses
Engineering and Design
Engineering and QA Procedures
Design Artifacts
Calculations
Chits
Drawings
SoWs and Tech Specs
Design Review Log
Systems Engineering
FMECA
Interfaces
Requirements and V&V
ES&H, ASO, and Commissioning
Project Safety and WPC Procedures
Safety Manual
Commissioning
ASO Implementaion
Safety Relevant Procedures and Standards
Q&A
20200526 Recovery Project CDE-3B IPR
Home
Review Information
Points of Contact
Review Committee
Charge Questions
Agenda
Remote Connection
B-205 Zoom Information
Cost and Schedule Private Zoom
Machine Core Private Zoom
Director's Conference Room Zoom Information
ES&H/ASO/QA Private Zoom
B343 Zoom Information
Balance of Plant Private Zoom
Full Committee Private Zoom
B-252 Zoom Information
Management Private Zoom
B-318 Zoom Information
Presentations
PM, Cost, Schedule and Risk
Organization
Risk
Management Documents
Cost and Schedule
Previous Reviews, Recommendations, and Responses
Engineering and Design
Engineering and QA Procedures
Design Artifacts
Calculations
Chits
Drawings
SoWs and Tech Specs
Design Review Log
Systems Engineering
FMECA
Interfaces
Requirements and V&V
ES&H, ASO, and Commissioning
Project Safety and WPC Procedures
Safety Manual
Commissioning
ASO Implementaion
Safety Relevant Procedures and Standards
Q&A
More
Home
Review Information
Points of Contact
Review Committee
Charge Questions
Agenda
Remote Connection
B-205 Zoom Information
Cost and Schedule Private Zoom
Machine Core Private Zoom
Director's Conference Room Zoom Information
ES&H/ASO/QA Private Zoom
B343 Zoom Information
Balance of Plant Private Zoom
Full Committee Private Zoom
B-252 Zoom Information
Management Private Zoom
B-318 Zoom Information
Presentations
PM, Cost, Schedule and Risk
Organization
Risk
Management Documents
Cost and Schedule
Previous Reviews, Recommendations, and Responses
Engineering and Design
Engineering and QA Procedures
Design Artifacts
Calculations
Chits
Drawings
SoWs and Tech Specs
Design Review Log
Systems Engineering
FMECA
Interfaces
Requirements and V&V
ES&H, ASO, and Commissioning
Project Safety and WPC Procedures
Safety Manual
Commissioning
ASO Implementaion
Safety Relevant Procedures and Standards
Q&A
Engineering Procedures
PPPL Engineering Procedures for Design, Procurement, Fabrication, Procedures, T-Mods (Links Below)
Engineering Program Description
ENG_PD.pdf
ENG-002 -
Control of Measuring Test Equipment and Calibration
ENG-006 -
Preparation, Review, and Approval of Technical Specifications
ENG-008 -
Failure Modes and Effects Analysis
ENG-010 -
Control of Drawings
ENG-012 -
Identification and Control of Items
ENG-030 -
PPPL Technical Procedures
ENG-032 -
Work Planning
ENG-033 -
Design Verification
ENG-036 -
Control of Temporary Modifications
ENG-050 -
Job Requirements Documentation & Control
ENG-059 -
Process Plan/Traveler for PPPL Built Components
ENG-060 -
Preparation, Review & Approval of SOWs
ENG-061 -
Engineering Document and Record Numbering
ENG-062 -
Planning and Performing Tests
ENG-063 -
System Breakdown Structure and Categorization
ENG-064 -
Interface Control
PPPL Engineering Standards (Links Below)
ES-MECH-007 -
Hoisting and Rigging Standard
ES-MECH-009 -
Design, Construction and Inspection of Wooden Stairs and Platforms
ES-MECH-010 -
Forklifts and Walkies
ES-MECH-012 -
Manlifts
ES-MECH-015 -
Pressure Systems Program
ES-MECH-016 -
Design, Construction, Determination and Inspection of Anchorages
ES-MECH-19 -
Seismic Design
Lab-Wide and Project QA Procedures (Links Below)
Quality Assurance Program Description
Quality Assurance Program Description.pdf
QA-003 -
Procurement Quality Assurance and Supplier Qualification
QA-004 -
QA/QC Site Inspection and Oversight
QA-005 -
Control of Nonconformances
QA-020 -
Suspect & Counterfeit Items Control and Dispositioning
QA-028 -
Software Quality Assurance
NSTX-U Quality Assurance Plan
NSTXU_1_QAP_100, R4 - NSTX-U Quality Assurance Plan (1).pdf
Lab-Wide ES&H Procedures (Links Below)
ESH-004 -
Job Hazard Analysis
ESH-016 -
Control of Hazardous Energy (Lockout/Tagout)
ESH-025 -
Operations Hazard Classification Criteria and Safety Certification System
Posted Safety Manual Sections:
link
D-Site Work-Planning and Control Documents:
link
Report abuse
Page details
Page updated
Report abuse