September 2017 Cost and Schedule Review
September 2018 Director's Review
March 2019 Basis of Estimate Review (BoER)
July 2019 Director's Review
August 2019 CDE-2/3A IPR
The primary purpose of this review was to receive feedback on the proposed cost and schedule in support of the FY-17 Extent of Condition Notable Outcome.
The committee report is located here, and the PPPL response to recommendations is located here.
The primary purpose of the NSTX-U Research Program Advisory Committee (PAC-39) meeting was to help the NSTX-U team prepare for the DOE/SC Assessment of NSTX-U Mission Need (see below). The PAC-39 Report is downloadable from here.
The purpose of the DOE/SC Assessment Phase 1 was to evaluate PPPL's proposed organization, capability, and means to execute the NSTX-U Facility recovery plans and resume operations.
The purpose of the DOE/SC Assessment Phase 2 was to evaluate the continued Mission Need for the NSTX Upgrade facility and associated research program.
The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a IPR in later 2018 or early 2019.
The final report from this Director's Review is available here.
The PPPL responses to the recommendations are available above or here.
The purpose of this review was to assess if the Basis of Estimate for the NSTX-U cost and schedule estimate was well documented, comprehensive, accurate and credible as defined by GAO-09-3SP and DOE Order 413.3B.
The final report from the Basis of Estimate Review is available here.
The PPPL responses to the recommendations are available above or here.
The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a IPR in the summer of 2019.
The final report from this Director's Review is available here.
The PPPL responses to the recommendations are available above or here.
The purpose of this review was to determine if the Recovery Project was ready for a CDE-2/3a ESAAB approval
The final report from this IPR is available here.
The PPPL responses to the recommendations are available above or here.
The purpose of this review was the verify the completion of final design for the NSTX-U Recovery Project
The final report from this review is available here.