Timeline and Executive Summary

Executive Summary

Fall

Planning

The early part of fall term was spent getting aquainted with our client, defining the scope of the project, and nailing down specific engineering requirements. Next, we created block diagram and delegated tasks among the group. We made initial design choices, such as using the DWM1001 Ultra Wideband (UWB) module. We had a working anchor board designed and in hand by the end of the term.

Winter

Implementation

With most of the design process out of the way, the focus shifted to implementation. The tag board was designed and ordered, and a motor was selected to interface with the camera. By the end of the term, we had completed the hardware part of the system and had a rough draft of the firmware.


Spring

Presentation

Although lab access was lost in the spring, we weren't impacted too seriously as we already had a working draft of the system. Aside from finalizing the firmware, we worked on project presentation and technical documentation, culminating in a demonstratin to our client and the Oregon State Senior Design Expo.

Project Timeline

Detailed timeline below, Agantty is a free project management service. The services developers are native German speakers. So the site's default language is set to German unfortunately there is no way to change this for a public link. But the important parts are in English.