June 2014 - July 2016
Process Engineer / Gas Plant Technician
-Ensured safe and optimum plant operation by analyzing process flows by statistical data analysis skills to identify potential deviations of electronic equipment, instrumentations, and process integrity;
-Demonstrated strong written and verbal communication skills presenting the findings to the Research & Development team; made strategic decisions for sustainability and continuous improvement.
-Supervised high-risk operational and maintenance tasks with attention to detail through Permit-to-work (PTW) management system for safety and efficiency.
-Strong leadership and collaboration demonstration in Installation and commissioning of 70 MMSCFD (million standard cubic feet per day) Natural Gas Booster compressors.
June 2014 – July 2014
Internship
· Safety training for plant operations and maintenance.
· Training on operation of one steam turbine and two gas turbines in total producing 450MW.
March 2012 - April 2012
Internship
· Training on production process of clinker and cement production maintaining proper safety.
· Participated in the installation & maintenance of heavy mechanical instruments, including preventive maintenance of horizontal and vertical roller mills, LBC, Dust Collector, Belt Patching, and Cold Vulcanizing.