A detailed cost study of this project was carried out using BCIS costs as a guide.
This was done by looking at similar projects that were built in South Yorkshire for libraries, classes, and IT suites.
This study gives an estimate of how the budget will be split among the different parts of the building process.
![](https://www.google.com/images/icons/product/drive-32.png)
Churchill Academy Science and Technology Block.
Location: Churchill, Somerset.
Date: August 25, 2017.
Cost of Construction: £3,162,613; £1,715 per square metre; 1,844 square metres of floor space;
Main Structure: steel-framed.
Levels: 2.
Level of Analysis: Elementary
The Churchill Academy science and technology block is a two-story building that needs work done on the outside, like preparing the site, paving, maintaining the parking lot, repairing the drains, and providing services.
COST PLAN
A cost plan has been made for KING ECGBERT SCHOOL for the construction of a knowledge hub using the reference from BCIS.