This is the next day after a few hours of adjustments to the collection box and adding another stage to the intake motor.
Auto shoot is being a little wonky. A little tuning needs to be completed. The other net will be attached and the "bottom" of the box needs to be installed.
Testing the shooter in a area with a low ceiling.
Integration day!
From an idea to a working system.
Testing the prototype of a lift to get off the arena floor and on to the tower level 1.
Testing the Shooter with the feeder assembly
It takes a creative group of students to find ways to make our available space work for designing, prototyping, building, and testing.
Marla, Lily, and Lulu present thier brainstorming board.
CNC Router Table
The newest piece of equipment assembly is is complete. On 11/1 it was tested.
Test run 1 success!
The Mercy M, prior to dust removale!
The team has been working on a variety of Engineering Challenges as well as branding, fundraising, and robot repairs.