The Lenape Valley baseball program takes pride in maintaining and upgrading its facilities. Last spring the club added a new batting practice half shell, and the bullpen was remodeled.
The playing surface underwent a face lift during the Fall of 2014. A laser grading process along with new grass and a professional mound helped make Patriot Field one of the best surfaces the Patriots will play on all year.
Left field measures in at 305 feet, left center at 345 feet, right center at 360 feet, and 310 feet down the right field line.
Within the last decade the Patriots have also upgraded their facility with a new batting cage, a digital scoreboard, a press box equipped with a professional sound system, and a full infield tarp.