PROJECT INFORMATION
PROJECT INFORMATION
Hotel Hampton by Hilton project is located on 57 Ketevan Tsamebuli Avenue, Tbilisi, Georgia. The project consists of 2 adjacent building blocks 23 floor residential and 12 floor hotel buildings with underground parking. Hotel Hampton project is designed for 170 Guest Rooms with Lobby located on ground level.
Construction of residential is already completed. Hotel construction is ongoing. Detailed scope of construction works are described in the tender documentation.
Hampton was launched in 1984, to meet travelers' needs for an economy hotel that offers consistent quality and a strong value. With over 1,900 hotels, our guests can expect the same level of quality service and amenities regardless of where they travel. Complimentary guest internet access, an appealing breakfast, and Hampton‘s bed experience establish Hampton’s position as an innovator and industry leader. This unbeatable combination helps contribute to a formula for success.
TENDER BRIEF
Dear Sirs,
ELEMSI llc invites all interested parties to submit proposals for the provision of Electrical, ELV and Fire Safety system design and construction services for Hampton by Hilton project in Tbilisi.
Contractor of the services will be required to prepare construction documentation based on the Detailed Design attached to the tender package, to ensure the design is fully confirming to Hampton requirements, FLS requirements and Local and International Codes and Standards. Design documentation must be finalized to achieve full compliance to comments provided in tender documentation.
Based on the agreed design the Contractor should execute supply, construction, testing and handover of the systems.
Participants have to submit their bid in accordance with the following Bid documents included by link associated with this letter:
1. Bid Instructions and Forms
Bid Form
Bid Supplemental Information
2. Trade Contract (terms and conditions)
3. Annex to the Trade Contract with appendixes and Attachments
Appendices
i. Appendix 1 Schedule of Documents
ii. Appendix 2 Technical reports, Drawings & Specifications
iii. Appendix 3 Programme (Time schedule)
iv. Appendix 4 Pricing Schedule
v. Appendix 5 Project Requirements
vi. Appendix 6 Payment Dates
vii. Appendix 7 Information Management Plan
Attachments
i. Attachment 1 Daily Report
ii. Attachment 2 Weekly Report
iii. Attachment 3 H&S Weekly Report
iv. Attachment 4 Meeting Schedule
v. Attachment 5 Request for delivery form
vi. Attachment 6 Traffic Management and Logistics Plan Guidance
vii. Attachment 7 Plant and Material Report
viii. Attachment 8 QA / QC Procedures requirements
You are requested to submit your Tender strictly in accordance with the Bid Instructions no later than 5 pm (Tbilisi, Georgian time) on 17th of March 2023.
Clarification meetings will be arranged by the request.
The Bidders should confirm availability to attend Clarification meeting.
Link is provided to enable you downloading the Bid documents. Please refer to attached instructions.
You are instructed to submit a letter confirming that all Bid documents are successfully downloaded from the server.
No changes should be applied to the Bid Documentation unless issued as a formal addendum.
If any questions appear during review of documents received in package please address to E-mail:
Procurement@lmc.ge
or
Ani Burduli - Procurement Manager
Tel: +995 577 681 687
Mail: a.burduli@lmc.ge
-
For the technical details please address to:
Giorgi Sikharulidze - Project Manager
Tel: +995 577 502 110
Mail: g.sikharulidze@lmc.ge
We look forward for your reply and your Bid by the date mentioned above.
Sincerely yours,
ELEMSI llc
Project Management Company
The Bidder is required to return the completed Bid and the Bid Supplemental Information. All alternatives should be clearly identified in the Pricing Schedule notes column. Data sheets and specifications for alternatives should be submitted with the Bid and in line with Pricing Instructions.
The Bidder should complete the Bid Form attached in Section 2 together with the Pricing Schedule forms attached in Section 3 and submit these as its completed Bid. The Bid Supplemental Information form set out in Section 4 should also be completed and pages attached to it as required and indicated on the Form.
For detailed instructions please find document titled "Bid From and Bid Instructions" in tender documentation package.
CLARIFICATIONS
07.03.2023 - Updated Price Schedule BoQ
Following positions were added to the Price Schedule BoQ: Switches, BOM, BMS, DATA Points.