These shutdowns are necessary to facilitate repairs to the power distribution system serving this building.
AFFECTED BUILDING
90
TIMING
Thursday, September 25, 6:00 a.m - Friday, September 26, 10:00 p.m. Building 90 will be shut off.
FOR BUILDING TENANTS
Equipment that is sensitive to power loss should be powered down in an abundance of caution. Please schedule the time necessary to be on-site to power down any such equipment and also to restore power to the equipment following the work. Use this guidance from EHS to prepare your lab or technical area.
The building will not be occupiable during the power outage.
A notification will be sent via email when power is restored to the building.
CONTACTS
For building-specific questions or temporary power needs for lab equipment, please contact Chris Gonzalez at 510-502-7842.