Liberty-Curtin Elementary School Project
New Building
Conceptual Design
Created by
Crabtree, Rohrbaugh & Associates
March 2024
Concrete Pouring Begins
May 2024 Update
The full outline of the building footings can now be seen at the new school w/ 90%+ of foundations complete. Floor slabs are under construction for both classroom wings.
Underground plumbing and electrical complete, yellow vapor barriers have been installed prior to concrete floor placement.
Overall school campus shows entire site being occupied for construction, including existing building, KCSD parking and construction including building, playground & stormwater construction.
Beyond foundations, substantial work has been completed running underground plumbing prior to concrete floor labs that are now being completed.
Conduit for installation under slabs along with classroom subsurface work in classroom wings.
With concrete slabs complete, concrete block wall construction is now fully underway with anticipated roof deck installation by June 2024.
November 2024 Update
The Liberty Curtin School is now fully enclosed, with window installation and rooftop mechanical equipment underway in preparation for the winter season.
The multipurpose room, intended for gym classes and lunch, is now fully enclosed and includes an opening to the main lobby, as well as high windows that allow natural light to fill the area. Equipment and systems are set to be installed soon.
The new classroom wings are now fully enclosed, with classroom walls and door frames being installed.
This photo illustrates the proximity of the new Liberty-Curtin School to the existing building.
The mechanical room is now fully enclosed, enabling the installation of building-wide water pumps, boilers, and other equipment.
Main hallway outside of Music/Art Classroom is in this photo at the end of the main lobby. Mechanical, plumbing & electrical systems are being installed above ceiling. Space will have views through classroom to exterior.
January 2025 Update
March 2025 Update
April 2025 Update
Student lockers in the C Hallway, which leads to the outdoor playground area.
Collaborative space just off the Main lobby area will be used for creative instruction within the building.