PROPOSED PROJECTS

Recommendation for Proposition A: $28,800,000

Grade Level Relocation:

  • Ingleside High School Grades 9-12

  • Leon Taylor Junior High Grades 6-8 (Grade 6 moving up from Blaschke-Sheldon Elementary)

  • Blaschke-Sheldon Elementary Becomes BSE Career Technical Center with a new state-of-the-art Welding Facility

  • Gilbert J. Mircovich Elementary Grades 3-5 (Grade 5 moving down from BSE)

  • Ingleside Primary School Grades PK-2 (Grade 2 moving down from GJM)

Leon Taylor Junior High

New addition will be added to Leon Taylor Junior High to increase the classroom count from 25 classrooms to 41 classrooms. The gym, dressing rooms, and cafeteria will also be extended and enlarged.

BSE Career Technical Center

The following classes currently held at Cook Annex will be relocated to BSE Career Technical Center:

  • Instrumentation Classes

  • Nursing Program

  • Ace Program (Credit Recovery)

  • DAEP Program (Disciplinary Alternative Education Program)

  • New Building that will expand and increase welding stations for the IISD Welding Program

  • Blaschke-Sheldon Elementary has a functioning cafeteria, multiple classrooms (15) for future growth of CTE (Career and Technical Education)

*OT Blaschke building would be demolished

Gilbert J. Mircovich Elementary

Additional canopies, an outdoor gym, and a new drop-off location drive located beside the school (facing 4th Street).

Recommendation for Proposition B: $3,200,000

  • Safety Lighting to be added to the Homeside Football Field Parking Lot

  • New bleachers and canopies for the softball field with dugout refurbishing and, update batting cage

  • Seating/bleacher additions and improvements for the baseball field, addition of canopies above the seating, batting cage update, and dugout refurbishing

  • Build new tennis courts (8) -- will be located next to the baseball field

  • New Baseball field Backstop and upgrades to the concession stand and restrooms