TFHS Track Repairs - 2025
Scope: Interim Repairs on the following areas of the TFHS track to allow for use between now and when a complete renovation to occur in summer 2026:
Scope: Interim Repairs on the following areas of the TFHS track to allow for use between now and when a complete renovation to occur in summer 2026:
· Pole Vaults
· Turn 1 lane 6
· Lane 3 behind scoreboard
· Lane 6 in front of pole vault
· Lane 1 and 6 by entrance
· Bump lane 5/6 by turn 3
Cost: $12,500
Cost: $12,500