TFHS Track Repairs - 2025
Scope: Interim Repairs on the following areas of the TFHS track to allow for use between now and when a complete renovation to occur in summer 2026:

 

·         Pole Vaults

·         Turn 1 lane 6

·         Lane 3 behind scoreboard 

·         Lane 6 in front of pole vault 

·         Lane 1 and 6 by entrance

·         Bump lane 5/6 by turn 3


Cost: $12,500