Click on each building name to expand and view project details
Window replacement as needed
Entire roof replacement
Original roof from 2006
Fire alarm system upgrade
Current system is from 2006, will be replaced by better technology
Voice capabilities
Boiler replacements
Existing units have reached the end of their useful life, will be replaced with more efficient units
HVAC improvements
Chiller replacement
AHU replacements, kitchen, classrooms
Energy Recovery Ventilator replacements (1 and 2)
In summary, full HVAC replacement. Existing units have reached the end of their useful life
Classroom unit ventilator upgrades
Current units are nearing the end of their useful life and do not supply adequate ventilation in some locations, are inefficient, and their operational volume impacts learning.
Will be replaced with like units, will be higher efficiency and quieter, and will improve indoor air quality
Domestic water heaters replacements
Outdoor education allowance
Furniture allowance
Classroom furniture district-wide to support group work, flexible seating, and modern learning
PA system upgrade
Upgrade intercom system for clear communication, daily use, and emergency response
Upgrade existing outdated bathrooms for ADA compliance
Existing bathrooms have original finishes and fixtures
Conditions are beyond life expectancy and do not meet current code.
Upgrades will include new finishes, new fixtures, and ADA code upgrades
Exterior brickwork repair/replacement allowance
Exterior brickwork is from 1957 and is original to the building, is causing issues around windows and building corners
Exterior door replacement as needed
Replacing all exterior doors that have not already been replaced, making the doors airtight, providing energy savings and added safety
Window replacement as needed
Windows are from 1986 and are past their useful life
Have gaps and moisture inside
Fire alarm system upgrade
Current system is from 2006 and past its useful life
New system will be integrated and voice automated
Boiler replacements
Existing units have reached the end of their useful life, will be replaced with more efficient units
HVAC improvements
Chiller replacement
Existing units have reached the end of their useful life, will be replaced with more efficient units
Cafeteria roof top unit replacement
Unit ventilator upgrades/replacement
Current units are nearing the end of their useful life and do not supply adequate ventilation in some locations, are inefficient, and their operational volume impacts learning
Will be replaced with like units, will be higher efficiency and quieter, and will improve indoor air quality
Domestic water heater replacement
Cafeteria renovation
Open the floor plan to remove the enclosed serving line and create a more versatile open concept common space with the ability to be used all day
New flooring, revised ceiling and lighting, revised color pallet
Updated flexible furniture
Outdoor education allowance
Furniture allowance
Classroom furniture district-wide to support group work, flexible seating, and modern learning
PA system upgrade
Upgrade intercom system for clear communication, daily use, and emergency response
South hallway bathroom renovations
Upgrades include becoming ADA compliant, new fixtures
North entry bathroom renovations
Upgrades include becoming ADA compliant, new fixtures
Roof replacement in 2026 and 2027
Roofing is from 2006 and has been leaking
Band room flooring with carpet tile replacement
Replace existing flooring due to bubbling and lifting, which creates safety hazards and affects functionality
Boiler replacement
HVAC improvements
Chiller replacement
Kitchen make up air unit replacement
Domestic water heater replacement
Memorial drive replacement
Outdoor education allowance
Furniture allowance
Classroom furniture district-wide to support group work, flexible seating, and modern learning
PA system upgrade
Upgrade intercom system for clear communication, daily use, and emergency response
Boiler replacement
Roof replacement
City will replace majority of Memorial Drive, district will work with the city to replace district owned parking spaces/areas
Click on each name to expand and view project details