Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Transmission: Machining
Control handle: In process of fabricating/purchasing parts
Electrical connections: Zebra connector going to be purchased
Accomplishments from Previous Week
Control handle CAD model
Machine shop said they could machine transmission part
Zebra connector concept
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Get transmission part machined - Ian
Control handle fabrication - Tugra
Determine how to mate transmission and control handle - Ian/Tugra
Purchase LEDs - Austin
Obtain zebra connector - Zack
Determine final model to use for electrical connections - Austin/Zack
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Main priority for control handle should be detachment mechanism
Pogo pin concept might be susceptible to water damage
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Look into zebra connectors
Attempting to obtain some
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
More figures in slides (5/3 - email)
Risks and Areas of Concern
Machining of transmission part may be difficult
Potential lead time for zebra connector
Resources or Information Required but not Available
Schedule
Fabricate spool mechanism by end of week 8
Fabricate control handle by end of week 8
Purchase and obtain electrical connections by end of week 8
Assemble parts by end of week 9
Budget (list amount spent and amount remaining)
Spent: 0
Remaining: $1500
Progress on Report and Webpage
Updated version of first draft being turned in on friday (5/17)