Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Final design of the adapter printed, and assembled for testing
PCB is being shipped
2nd design of hub printed
Accomplishments from Previous Week
PCB coming in soon
Adapter nearly finalized, testingÂ
hub printed
Goals for Next Week (list names after each item). Use specific and measurable objectives.
iron out the details of the prints
put everything together and test as a whole
get hub alterations done for next week, and get that printed as soon as possible
hopefully have tools necessary to begin testing of A/V signals
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Likes the overall design of hub
does not want hub to be too small, current size is good
switch the placements of the A and V ports
For the tablet GUI have all the waveforms on one plot
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
A\V signals, do not have tools to test the amplification and signal quality, unsure if current circuit is good enough.
Testing on pigs, if possible, most likely week 10
If modifications to circuit need to be made, very limited on time
Resources or Information Required but not Available
Simulator/tester/heart for A/V signals
Schedule
milestones: have adapter done by next week, if needed print the final print.
test PCB alongside the adapter
finalize hub
finalize GUI.
Budget (list amount spent and amount remaining)
Total budget remaining - $5378.35
Progress on Report and Webpage
2nd draft finished