Mengru Tu*, M.F. Yang, Kao, S.-L (2020, Jul),”Using a heuristic multi-objective genetic algorithm to solve the storage assignment problem for CPS-based pick-and-pass system”, Enterprise Information Systems(Article in press)(SCI, Impact Factor = 2.145).
Ko, M.-D., Wang, C.-C., Yang, M.-F. (2019,Mar),” Optimal integrated inventory model with preventive maintenance program based on rapid inspection”, IAENG International Journal of Applied Mathematics,49(4),1-7(EI).
Fang, H.-H., Yang, M.-F., Chao, Y.-T., Wu, J.-N. (2019,Mar),” Study of using RFID for fuzzy integrated inventory model”, Lecture Notes in Engineering and Computer Science, 520-525(EI).
Kao, S.-L., Su, C.-M., Yang, M.-F., Chen, L.-A. (2019,Mar),” Fuzzy closed-loop supply chain considered container return time”, Lecture Notes in Engineering and Computer Science, 381-385(EI).
Fang, H.-H., Yang, M.-F., Chao, Y.-T., Lai, S.-C. (2019,Mar),” Multi-stage inventory model with fuzzy demand in supply chain networks”, Lecture Notes in Engineering and Computer Science, 500-504(EI).
Tu, M., Shih, P.-H., Yang, M.-F., Lin, C.-K., Kao, S.-L.(2019,Mar),” Using multi-objective genetic algorithm on order picking system”, Lecture Notes in Engineering and Computer Science, 35-36(EI).
N. Ndraha, H.I. Hsiao*, J. Vlajic, M.F. Yang, H.T. Lin(2018, Jul),” Time-temperature abuse in the food cold chain: Review of issues, challenges, and recommendations”, Food Control,89,12-21.(SCI, Impact Factor = 3.667).
M.F. Yang and Y. Lin* (2018, Mar), “Integrated Inventory Model with Backorder and Minimal Repair in a Supply Chain”, Proceedings of the Institution of Mechanical Engineers, Part B, Journal of Engineering Manufacture, 232(3), 546-560. (SCI, Impact Factor = 1.445)
Y.L. Su , M.F. Yang , Mengru Tu , Yi Lin(2018, Jan),” Optimal Imperfect Preventive Maintenance Logistic Inventory Model With Backorder And Minimal Repair,” Journal of Marine Science and Technology-Taiwan, 26(1),50-63. (SCI, Impact Factor = 0.372).
Mengru Tu*, Ming K Lim, M.F. Yang (2018, Jan), "Internet of Things-based production logistics and supply chain system-Part 1: Modeling IoT-based manufacturing supply chain," Industrial Management and Data Systems,118(1),65-95. (SCI, Impact Factor = 2.205).
Mengru Tu*, Ming K Lim, M.F. Yang (2018, Jan), " Internet of Things-based production logistics and supply chain system-Part 2: IoT-based cyber-physical system: A framework and evaluation," Industrial Management and Data Systems,118(1),96-124. (SCI, Impact Factor = 2.205).
Y.L. Su , M.F. Yang , Mengru Tu , Yi Lin(2017, Aug),” Optimal Imperfect Preventive Maintenance Logistic Inventory Model With Backorder And Minimal Repair,” Journal of Marine Science and Technology-Taiwan(Accepted, Article in press). (SCI, Impact Factor = 0.32).
Mengru Tu*, Ming K Lim, M.F. Yang (2017, Jul), "Internet of Things-based production logistics and supply chain system-Part 1: Modeling IoT-based manufacturing supply chain," Industrial Management and Data Systems (Accepted, Article in press). (SCI, Impact Factor = 2.205).
Mengru Tu*, Ming K Lim, M.F. Yang (2017, Jul), " Internet of Things-based production logistics and supply chain system-Part 2: IoT-based cyber-physical system: A framework and evaluation," Industrial Management and Data Systems (Accepted, Article in press). (SCI, Impact Factor = 2.205).
Hsin-I Hsiao, Mengru Tu*, M.F. Yang, Wei-Chung Tseng (2017, Jul), "Deteriorating inventory model for Ready-to-eat food under fuzzy environment," International Journal of Logistics Research and Applications (Accepted, Article in press). (SSCI, Impact Factor = 1.018).
M.F. Yang, Y.Y. Zou, M.C. Lo and Y.T. Chao,(2016,March) “Integrated supply chain inventory model with progressive carbon taxation”, Lecture Notes in Engineering and Computer Science, (EI)
M.C. Lo, M.F. Yang*, T.S. Hung and S.F. Wang,(2016,March) “Integrated Assembled Production Inventory Model”, Lecture Notes in Engineering and Computer Science, (EI)
M.F. Yang and Y. Lin* (2016, Mar). Integrated Inventory Model with Backorder and Minimal Repair in a Supply Chain, Proceedings of the Institution of Mechanical Engineers, Part B, Journal of Engineering Manufacture(Accepted).(SCI)
M.F. Yang, Y. Lin*, W.F. Kao and L.H. Ho (2016, Mar). An Integrated Multi-echelon Logistics Model with Uncertain Delivery Lead Time and Quality Unreliability, Mathematical Problems in Engineering (Accepted).(SCI)
M.F. Yang*, M.C. Lo and W.H. Chen (2015, Nov). Optimal Strategy for the Three-echelon Inventory System with Defective Product, Rework and Fuzzy Demand under Credit Period, Engineering Letters, Vol.23(2015),No.4,312-317. (EI)
M.F. Yang* and Y. Lin (2015, Jul). Process is unreliable and quantity discounts supply chain integration inventory model. American Journal of Engineering and Applied Sciences, Vol.8(2015),No.4,602-610. (EI)
M. F. Yang* and W.C. Tseng (2015, Apr). Deteriorating Inventory Model for Chilled Food. Mathematical Problems in Engineering, Volume 2015, Article ID 816876, 10 pages .(SCI, 23/90 ,ENGINEERING, MULTIDISCIPLINARY).
M.F. Yang*, Wei Hao Chen, Jun Yuan Kuo and Yi Lin (2015, Apr). Integrated supply chain cooperative inventory model with payment period being dependent on purchasing price under defective rate condition. Mathematical Problems in Engineering, Volume 2015, Article ID 816876, 10 pages. (SCI, 23/90 ,ENGINEERING, MULTIDISCIPLINARY).
M.F. Yang*, Y.T. Chou, M.C. Lo, and Wei Hao Chen, (2015, Mar). Three-echelon Inventory Model with Defective Product and Rework Considerations under Credit Period, Lecture Notes in Engineering and Computer Science, 2015(2),883-887.(EI)
M.F.Yang (2014, Sep). An Integrated Inventory Model for Deteriorating Product under Inflationary Condition. The Scientific World Journal, (Accepted). (SCI, 16/55, MULTIDISCIPLINARY SCIENCES).
C.Y. Chiu,Y. Lin, and M.F.Yang (2014, Jul). Applying Fuzzy Multi objective Integrated Logistics Model to Green Supply Chain Problems. Journal of Applied Mathematics, Volume 2014, Article ID 767095, 12 pages. (SCI, 104/247,MATHEMATICS, APPLIED ). NSC 100-2410-H-019-004.
M. F. Yang and W.C. Tseng (2014, May). Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration. Mathematical Problems in Engineering, Volume 2014, Article ID 809149, 16 pages. (SCI, 23/90 ,ENGINEERING, MULTIDISCIPLINARY).
M.F. Yang, Y.T. Chou, M.C. Lo, and W.C. Tseng (2014, Mar). Applying Fuzzy Time Distribution in PERT Model. Lecture Notes in Engineering and Computer Science, 2210,1084-1087.(EI).
M.F. Yang* and Y. Lin (2013, Dec). Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method. Computers & Industrial Engineering, 66(4),1061-1069. (SCI, 16/44,ENGINEERING, INDUSTRIAL ).
M.F. Yang, M.C. Lo* and T.P. Lu (2013, Oct). A vendor-buyers integrated inventory model involving quality improvement investment in a supply chain. Journal of Marine Science and Technology-Taiwan, 21(5),586-593. (SCIE, 56/90,ENGINEERING, MULTIDISCIPLINARY). NSC 101-2622-H-019-001-CC3.
C.Y. Chiu, M.F. Yang*, C.J. Tang and Y. Lin (2012, Oct). Integrated imperfect production inventory model under permissible delay in payments depending onthe order quantity. Journal of Industrial and Management Optimization , 9(4),945-965. (SCI, 47/77,OPERATIONS RESEARCH & MANAGEMENT SCIENCE ).
M.F. Yang*, C.M. SU, M.C. Lo, H.H. Lee and W.C. Tseng (2013, Mar).” Integrated inventory model with decreasing probability of imperfect maintenance in a supply chain”, Lecture Notes in Engineering and Computer Science, 2203,959-963.(EI)
T. F. Liang*, T. S. Huang, and M. F. Yang (2012, Aug). Application of fuzzy mathematical programming to imprecise project management decisions. Quality and Quantity , Vol. 46, No. 5,P.1451-P.1470 . (SSCI, 64/116, STATISTICS, PROBABILITY).
M.F. Yang* and Y. Lin (2012, Feb). Integrated cooperative inventory models with one vendor and multiple buyers in the supply chain. European Journal of Industrial Engineering, Vol.6, No.2, P.153-P.176. (SCI, 34/43, ENGINEERING,INDUSTRIAL).
H.J. Tu, M.C. Lo* and M.F. Yang, “A two-echelon inventory model for fuzzy demand with mutual beneficial pricing approach in a supply chain” African Journal of Business Management (Accepted August 31, 2010). (Impact Factor 1.105, 58/112) (SSCI).
M.F. Yang and M.C. Lo*, “Considering single-vendor and multiple-buyers integrated supply chain inventory model with lead time reduction”, Proceedings of the Institution of Mechanical Engineers, Part B, Journal of Engineering Manufacture , Vol.225 (2011), 747-759. (Impact Factor 0.412, 34/37) (SCI).
M.J. Wang and M.F. Yang*,” Application of signed distances method to integrated linear programming for fuzzy multi-objective project management”, International Journal of Innovative Computing Information and Control, Vol.6 (2011), No. 11, 5015-5034. (Impact Factor 2.932, 14/103) (SCI).
M.F. Yang*, T.S. Huang and Y. Lin,” Variable lead time fuzzy inventory system under backorder rate with allowed shortage”, International Journal of Innovative Computing Information and Control, Vol.6 (2010), No. 11, 5015-5034. (Impact Factor 2.932, 14/103) (SCI).
M.F. Yang*,” Supply Chain Integrated Inventory Model with Present Value and Dependent Crashing Cost is Polynomial”, Mathematical and Computer Modelling, Vol.51 (2010), No. 5, 802-809. (Impact Factor 1.103, 62/204)(SCI). (NSC 98-2410-H-412-002)
M.F. Yang* and Y. Lin,” Applying the Linear Particle Swarm Optimization to a Serial Multi-echelon Inventory Model”, Expert Systems With Applications, Vol.37 (2010), No. 3, 2599-2608. (Impact Factor 2.908, 3/73) (SCI).
M.F. Yang* and Y. Lin, “The coordinated scheduling support system of production and delivery”, American Journal of Applied Sciences, Vol.6(2009), No.4, 601-607.(EI)
M.C. Lo* and M.F. Yang, “Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments”, Mathematical Problems in Engineering, Article ID 386252(2008). (Impact Factor 0.545, 44/68) (SCI)
C.H. Pan* and M.F. Yang, “Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain”, International Journal of Production Research, Vol.46 (2008), No. 3, 753-770. (Impact Factor 0.774, 21/33) (SCI)
M.F. Yang, J.J. Hou and H.J. Tu*,” An Empirical Study of Conscientiousness on Leisure Satisfaction to Play Online Games”, Social Behavior and Personality, Vol.36 (2008), No. 5, 1379-1384. (Impact Factor 0.319, 47/50) (SSCI)
M.F. Yang*, “Using simulation to object-oriented order picking system”, Information Technology Journal, Vol.7 (2008), No. 1, 224-227. (EI)
T.Y. Huang and M.F. Yang*, “Integrated inventory decision support system with backorders and controllable lead time”, Journal of Information & Optimization Sciences Vol.29 (2008), No. 3, 513-522. (EI)
J.J. Hou, H.J. Tu* and M.F. Yang,” Agreeableness and leisure satisfaction in the context of online games”, Social Behavior and Personality, Vol.35 (2007), No. 10, 659-664. (Impact Factor 0.356, 45/47) (SSCI)
M.F. Yang*, “Optimal strategy for the integrated vendor-buyer inventory model with fuzzy annual demand and fuzzy adjustable production rate”, Journal of Applied Sciences, Vol.7 (2007), No. 7, 1025-1029. (EI)
M.F. Yang*, H.J. Tu and C.M. Wang, “Determining the single-vender and single-buyer inventory strategy with fuzzy setup cost and fuzzy ordering cost”, Journal of Statistics & Management Systems, Vol. 10 (2007), 499-510. (EI).
Ming-Cheng Lo* and M.F. Yang, “Safety factor considerations in fuzzy annual demand inventory model with backorder discount”, Journal of Statistics & Management Systems, Vol. 10 (2007), No. 2, 267–278, (EI).
C.H. Pan and M.F. Yang*, “Mixture inventory model in fuzzy demand with controllable lead time”, Journal of Statistics & Management Systems, Vol. 9 (2006), 341-357. (EI)
M.F. Yang*, “A two-echelon inventory model with fuzzy annual demand in a supply chain”, Journal of Information & Optimization Sciences, Vol. 27 (2006), No. 3, 537-550. (EI)
楊明峰、 洪慧芬、 王楷文、 周芝融、 周璿、 曹寧, 「應用FAHP 建構冷凍倉儲設備評選之研究-以包裝食品為例」, 工商管理學刊,Vol.7 (2014), No.1, 22-34.
沈群英* 、楊明峯、羅明正、林網生,「產銷協調下建廠專案管理關鍵成功因素之研究」, 先進工程學刊, Vol.5 (2010), No.2,97-104.
M.F. Yang* and P.H. Chen, Y.C. Chen, “Using a MCDM model for evaluating intelligent mall building systems”, 運籌與管理學刊, Vol.7 (2008), No.2,39-47.
M.F. Yang* and R.S. Chen, Y.C. Chen, “Using MCDM approach for evaluation in food quality management of bakery sector”, 運籌與管理學刊, Vol.7 (2008), No.2,15-23.
楊明峯*、羅明正、沈群英, 「應用模糊理論於調整生產率之整合存貨模式」,清雲學報, Vol.28 (2008), No.1,105-114.
楊明峯*、黃生、吳銘泓、吳致綸, 「綜合高中學群選擇決策支援系統」,育達商管學報, Vol.2 (2005), 151-164
楊明峯*、林俊達, 「應用模糊理論建構彈性製造系統配置規劃之決策支援系統」, 育達研究叢刊, Vol.6 (2003), 259-282.
C.Y. Chiu*, C.L. Meng and M.F. Yang, “Comprehensive High School Learning Group Selection Model Using Fuzzy Set Theory”,Educational Research & Information, Vol. 10 (2002), No. 4, .67-84.(TSSCI)